background image

Page 4

1.

Place the face frame

 

(A)

face dow

n on 

a flat

 

soft

 

working surface

 

t

ensure that

 

the

fac

e is 

not scratched or damaged.

(Figu

re 

1)

.

2.

Install the Side Panels (Figure 2): 

Insert right and left side panels 

(B) 

int

the

 g

rooves o

th

fac

fram

(A) 

a

nd 

alig

the

 

cam

 

lock connectors

(Figu

re 

2).

 

Lock

 t

he cam

 

wit

a screwdrive

by

 

turningthe

 

screw

 

180° clockwise

(Figure4)

.

3.

Install

 

the

 

Bottom

 and Microwave shelf

 

(Figure

 

3):

 

Gently sprea

the

 

side panels 

(B)

 

and

insert

(C)

 

&

 

(D)

 

into

 

the

 

grooves

 

of

 

side

 

panels

(B)

 

u

ntil 

they are seated in the

 

face frame 

(A)

.

4.

Installing the

 

Back Panel

 

and

 

Toe

 

Kick (Figure

 

5):

 

Before

 you start this step, put the

 

back

 

pane

(E) 

on a flat surface facing upward. Install the dr

awer slide supports

 

(

f

in the pre‐ 

 

spotte

d a

rea

 on t

he

 

back

 pa

ne

(Figu

re 

6).

 

The

 

bottom of the slide supports should be facing

the bottom groove.

 S

ecu

re them wi

th

 2 s

crews each 

(e)

 

(

Figure

 6). 

The

install

 

the back

 

pane

(E) 

to the re

ar of side pane

ls

 

(B) (Figur

e

 5)

. A

lig

n and 

lock

 e

ac

h c

am

 loc

k

Insta

ll t

he

 Toe K

ick

 

(

F

by

lockin

F

 

H

 

7

.

Installing

 

the

 

Corner

 

Braces

 

(Figure

 

10

)

 

and

 

inserting

 

th

 

Drawer:

 

Place

 

the

 

corner

braces

 

(b)

 

on

 

each

 

top

 

corner

 

of

 

the

 

cabinet

 

and

 

secure

 

them

 

wi

th the ½” Cor

ner

 

 Brace

 Scr

ews 

(c)

.

Slide

 the drawer into the rail

s

 and check the dr

awe

r position

. Install the rubber bumpers 

(a)

 onto 

the corners of the door and drawer front 

(G)

 where they contact the frame.

Figure 

10

 

b

b

c

Q

 

ty

 

4

 

Qty

 

8

 

5

.

Install

 

the

 

Drawer

 

 

Slide

 

Rails:

 

Insert

 

th

draw

er 

sid

rail

'

s

 

back end

 

(

g

into

 

the

hold

er (

f

)

 

previously

 installed 

(Ste

p 4) 

on 

the

 

back

 

panel 

(

D

) (Figure 

8

)

.

The

secure

 

the

 

drawer

 

ra

il 

front end

 

with

 

1/2”

 

 screws

 

(

d

using

 

the

 

pre

drilled

 

 holes

 

in

 

the

 

face

 

frame 

(A)

.

6

.

Dra

wer Assemb

ly

 (

Figu

re 

9

)

First

 

assembl

th

draw

er 

front 

(

F

)

 

with

 

draw

er 

box

 

front

(H)

 with

 

screws 

(

e

)

.

  

Then

 

assembl

th

rest

 

parts

 

of

 

draw

er 

box

 

(H)

 

using your palm, or a rubber 

mallet if needed, to secure the dove tails into position.

 Repeat steps for remaining drawers.

e

Q

t

3-

5

 each

a

 

Qty

 

12

 

Figure 

9

D

E

B

Figure 

8

Top

 

g

 

f

g

Qty 

6

 - 

3

 Set

d

Qty

 

6

Reviews: