background image

Battery Box Premium HV Combiner Box

 

BYD Smart Device Hungary Kft.

Installation Manual V1.

1

Legal Provisions 

All the information in this document is the property of 

BYD Smart Device Hungary Kft.

 No part 

of this document could be reproduced in any way for business use. Internal use is allowed.  

BYD Smart Device Hungary Kft.

 makes no representations or warranties express or implied, with 

respect to this document, including (with no limitation) any implied warranties of utility, 

merchantability, or fitness for any particular purpose. All such representations or warranties are 

expressly disclaimed. Neither 

BYD Smart Device Hungary Kft.

 nor its distributors or dealers shall 

be liable for any indirect, incidental, or consequential damages under any circumstances. 

The exclusion of implied warranties may not apply in all cases under some statutes, and thus the 

above exclusion may not apply.   

This document does not replace and is not intended to replace any local, state, provincial, federal, or 

national laws, regulations, or codes applicable to the installation, electrical safety, and use of the 

battery system. 

BYD Smart Device Hungary Kft.

 assumes no responsibility for the compliance or 

noncompliance with such laws or codes in connection with the installation of the battery system. 

Specifications are subject to change without notice. Every effort has been made to make this 

document complete, accurate, and up-to-date. However, 

BYD Smart Device Hungary Kft.

 may 

need to make some improvements under certain circumstances without advance notice. 

BYD 

Smart Device Hungary Kft.

 shall not be responsible for any loss caused by this document, 

including, but not limited to, omissions errors, typographical errors, arithmetical errors, or listing 

errors in this document. 
All trademarks are recognized. 

BYD Smart Device Hungary Kft.

H-2071 Páty, Szent József út 4.

 

Summary of Contents for Battery-Box Premium HV Combiner Box

Page 1: ...Battery Box Premium HV Combiner Box Installation Manual Model CBH 40A V1 1 BYD Smart Device Hungary Kft...

Page 2: ...es under some statutes and thus the above exclusion may not apply This document does not replace and is not intended to replace any local state provincial federal or national laws regulations or codes...

Page 3: ...Wall Mounting 11 5 1 1 Selecting the Mounting Location 11 5 1 2 Mounting the Combiner Box 11 6 Electrical Connection 13 6 1 Connection Instructions 13 6 1 1 Preliminary Checks 13 6 1 2 Safety during...

Page 4: ...um HV Combiner Box Installation Manual V1 1 4 8 Decommissioning 19 8 1 Disassembling the Combiner Box 19 8 2 Disposing of the Combiner Box 19 9 Technical Data 20 10 Contact Information 22 BYD Smart De...

Page 5: ...all safety instructions Training in dealing with the hazards associated with the installation and operation of electrical equipment and batteries Training in the installation and commissioning of elec...

Page 6: ...since they provide important information on safe use and maintenance BYD may make technical changes in this manual and to the product at any time without notice In case of typing errors or other types...

Page 7: ...ive covers must always be mounted Danger to life from electric shock due to live DC cables Touching live DC cables from batteries or an inverter results in death or serious injury Prior to connecting...

Page 8: ...mage Contact your distributor if the scope of delivery is incomplete or damaged Figure 1 Component included in the scope of delivery A Battery Box Premium HV Combiner Box CBH 40A B Installation Manual...

Page 9: ...wer cable and grounding cable from the battery tower Number 1 4 2 Type Label There is one type label attached to the Combiner Box The type label is located on the left upside of the Combiner Box You w...

Page 10: ...lectrical voltage WEEE designation Do not dispose of the system together with the household waste but in accordance with the disposal regulations for electronic waste applicable at the installation si...

Page 11: ...nclosure is not mounted in the path of rainwater Requirements for mounting o Mount the Combiner Box in such a way that the connection area is facing downwards o The recommended height of the wall box...

Page 12: ...Procedure 1 Mark the position of the drill holes on the wall or stand 2 Drill holes at the marked positions 3 If necessary insert the screw anchors 4 Fasten the Combiner Box to the wall or stand usin...

Page 13: ...er Box is firmly anchored to walls and stable supports There are no remaining metallic parts chips and derivatives from the installation activities After performing the checks listed in the points abo...

Page 14: ...ut from battery towers D Output DC cable glands to an inverter E Grounding cable output gland to a common ground point Danger to life due to electric shock High voltages are present in the live compon...

Page 15: ...unding cables D Output DC cable blocks E Grounding post for output grounding cable 6 3 Leading the Cables through the Cable Glands with sealing Gasket Procedure 1 Release the cable gland 2 Lead the ca...

Page 16: ...al cable support rail 2 Cut the cables to length and strip 25 mm off the insulation 3 If you are using bootlace ferrules mount the bootlace ferrules and crimp gas tight 4 Lead the cables to the blocks...

Page 17: ...5 Connecting the Grounding Cable Cable requirement Conductor cross section 10 16 mm2 Outer diameter 5 mm to 12 5 mm With a ring terminal Procedure 1 Loose the original nut and washer on the ground pos...

Page 18: ...c torque tool There are no burn marks on the terminals Yearly Visual inspection The door panel of the enclosure is firmly closed at the end of all the checks and after any maintenance Yearly Visual in...

Page 19: ...Disassemble the Combiner Box 8 2 Disposing of the Combiner Box Dispose of the Combiner Box in accordance with the applicable disposal regulations for electronic waste Danger to life due to electric sh...

Page 20: ...output current 40A Rated Current of the ASSEMBLY InA 40A Rated short time withstand current Icw 10kA Pollution degree 3 Fuse holder Rail Mounting 1 500 VDC Fuse type 40A 22x58 1 500 VDC gPV MECHANICA...

Page 21: ...ring storage 10 50 Humidity 0 to 95 non condensing Altitude up to 4 000 m Note 2 DC INPUT DATA Maximum number of battery towers 3 Input cable glands entry 9 M20 1 5 with 1 input each Input connection...

Page 22: ...y Ltd service alpspower com au Telephone 61 2 8005 6688 Address 14 47 51 Lorraine St Peakhurst NSW 221 www alpspower com au Europe EFT Systems GmbH service eft systems de Telephone 49 9352 8523999 44...

Reviews: