background image

EN

28

The scope of delivery of the RO device includes:

Microprocessor controller:

1

    OLED display

 (monochrome: blue)

2

    Function button: ON/OFF and standby

3

    Function button: Upward

4

    Function button: Downward

5

    Function button: Confirmation/OK

6

    Status/Alarm LED (

green:

 ready, working, flushing, pause

      

red:

 

service, no feed water, alarm

)

Connections and service components:

7

    Electrical wiring with grounded PE mains plug “CEE7“

8

    Feed water connection 

3/4“ 

male thread

9

    Permeate connection 3/8“ male thread 

10

 

Concentrate connection Ø 8mm

11

 

Service opening for adjusting the pump pressure

Optionally available, Item no. 824047:

12

  External contacts (INPUT/OUTPUT), 3-pin, M8

     for the communication between RO unit and 
     the external unit for external start-/stop switching (DI)
     and alarm output (DO).

1.3 Manufacturer

The RO devices BWT bestaqua 6,12,18 are 

manufactured in the name of:

BWT water + more GmbH

Walter-Simmer-Straße 4

AT-5310 Mondsee

Phone:   +43/6232/5011-0

Fax:   +43/6232/4058

1.4 General comments

Following the instructions in this Installation and Operating  

Manual (IOM) helps the operator to run the reverse osmosis 

BWT bestaqua 6,12,18 reliably and economically. This Ma-

nual (IOM) is part of the device and must be constantly avai-

lable at the place of operation for all assigned staff members.

1.4.1 Reading of the manual (IOM)

The staff must have read and understood this IOM prior to any 

work being carried out. A basic precondition for safe working 

is the adherence to all stated safety and operating instructions.

In  addition,  the  local  accident  prevention  provisions  and  the 

general safety provisions effective at the place of operation are 

applicable. The illustrations in these instructions serve the basic 

understanding  and  can  deviate  from  the  actual  design  of  the 

device. Justified claims cannot be derived from the same.

1.2 Scope of delivery

The reverse osmosis unit BWT bestaqua 6,12,18 

consists of 3 core components:

s¬-EASURING¬AND¬CONTROL¬UNIT
s¬(IGH¬PRESSURE¬PUMP¬
s¬2/¬UNIT

Fig. 1:

 

BWT bestaqua 6,12,18 - Front view of the device

Fig. 2:

 

BWT bestaqua 6,12,18 - Rear view of the device

1

5

4

3

2

10

9

8

7

12

11

6

Summary of Contents for bestaqua 12

Page 1: ...Einbau und Bedienungsanleitung DE Fitting and operating instructions EN Notice de montage et d utilisation FR Istruzioni di montaggio e per l uso IT BWT bestaqua 6 BWT bestaqua 12 BWT bestaqua 18 ...

Page 2: ... requirements 31 1 7 2 Feed water requirements 31 1 7 3 Setting the correct operating pressure 31 Chapter 2 Assembly and installation 31 2 1 Preparation for assembly 31 Chapter 3 Operation and programming of the software 33 3 1 Quick operation guide 33 3 2 Function keys and display elements 33 3 3 Switching the device ON and OFF 34 3 4 Menu display of the activated system 34 3 5 Option External I ...

Page 3: ... the device which is capable of desalinating the raw water by high pressure and flow SDI Abbreviation for Silt Density Index The Silt Density Index is an indicator of the organic contamination of raw water The measurement system is a filtration process which determines the blocking tendency measured during 15 min IOM Abbreviation for Installation and Operating Manual Permeate yield WCF The ratio b...

Page 4: ...232 4058 1 4 General comments Following the instructions in this Installation and Operating Manual IOM helps the operator to run the reverse osmosis BWT bestaqua 6 12 18 reliably and economically This Ma nual IOM is part of the device and must be constantly avai lable at the place of operation for all assigned staff members 1 4 1 Reading of the manual IOM The staff must have read and understood th...

Page 5: ...pot Details or orders and prohibitions to avoid personal injury or extensive damage to property Please observe Underlines useful recommendations and information for an efficient operation free of any interruptions Note Additional information for the operator 1 5 Operation and safety precaution advices The following chapter provides an overview of all important operation and safety precaution advic...

Page 6: ...cted by skilled and instructed person The user has to be trained by a BWT organisation or other authorised person to operate the RO device s Trained and instructed staff Was instructed about all possible dangers due to improper use s Qualified persons Are able to install commission and service an RO unit due to their qualification knowledge and experience in current regulations 1 5 5 Shutdown peri...

Page 7: ...e The emission of interference voltage peaks high frequency electromagnetic fields interference voltages voltage fluctuations by surrounding electrical systems may not exceed the maximum values specified in EN 61000 6 4 1 7 2 Feed water requirements The RO unit must only be fed with cold drinking water maximum 30 C which meets the official requirements for potable water and covers the specificatio...

Page 8: ...ally External contacts OUTPUT alarm output Hydraulic installation Please respect the general installation instructions for the preparation of water installations as well as the general hygiene requirements s 0LEASE READ OBSERVE ALL APPLICABLE SPECIlCATIONS OPERATING and safety instructions prior to the installation s 0LEASE USE ONLY APPROVED mEXIBLE HOSES ACCORDING TO the DVGW W 543 requirements s...

Page 9: ...Observe The unit doesn t start in case of a new emerging permeate demand Only in the mode PAUSE is your RO unit programmable working RO unit is in production WORKING By pressing the ON OFF button the production is interrupted and the PAUSE message appears by a repeated pressing the production start again flush The RO unit rinses internally flush and switches after that automatically to the operati...

Page 10: ... in operating condition WORKING the stop pressure signal has not been reached yet Interrupting the production Brief pressing of the ON OFF button the device swit ches to PAUSE The device restarts after pressing the O button and is immediately available for operation Switching the unit OFF only possible during operation For a complete deactivation of the device please press the ON OFF button for ab...

Page 11: ...external Input and Output kit enables the use of the potential free NO contact to activate the remote On Off switching of the RO units installable alarm output All RO alarms can be transferred as an common alarm to an external control The external I O kit is either already preinstalled or upgradable as an additional install option External I O installation KIT Order no 824047 READY to start waitin...

Page 12: ...The recommended target values of all settings are documented in the form Form for set values of BWT bestaqua 6 12 18 see Part 7 1 Document the parameters after you have set all of the data at the device Please use the template at the end of the operating instructions 3 7 1 Menu SETUP General settings Note The change in the programming menu is avai lable from both the main screen pause as well as f...

Page 13: ... 11 DATE 19 8 13 DATE TIME CONDUCTIVITY TDS OPERATION MODE LANGUAGE BACK TIME 13 11 TIME 19 11 TIME 19 11 TIME 19 21 DATE TIME CONDUCTIVITY TDS OPERATION MODE LANGUAGE BACK DATE TIME CONDUCTIVITY TDS OPERATION MODE LANGUAGE BACK ENGLISH DEUTSCH FRANCAIS ITALIANO BACK ENGLISH DEUTSCH FRANCAIS ITALIANO BACK ENGLISH DEUTSCH FRANCAIS ITALIANO BACK ENGLISH DEUTSCH FRANCAIS ITALIANO BACK ENGLISH DEUTSCH...

Page 14: ...e OPERATING MODE PRESSURE SET BACK PASSWORD _ _ _ _ _ _ STOP AT 2 1 bar STOP AT 3 1 bar OPERATING MODE PRESSURE SET BACK ON LINE OFF LINE BACK ON LINE OFF LINE BACK ON LINE OFF LINE BACK ON LINE OFF LINE BACK DATE TIME CONDUCTIVITY TDS OPERATION MODE LANGUAGE BACK Fig 12 to call up the LANGUAGE menu refer to Fig 12 PASSWORD OPERATING MODE PRESSURE SET BACK Setting range for inlet pressure 2 0 4 0 ...

Page 15: ...nu and retun to selection menu Fig 15b Menu Level 2 SERVICE settings Note The menu SERVICE INTERVAL is secured by a password Please contact the BWT service in case of a change of the system settings The current servicecounter of the service interval days is accessible via the mode READY by pressing the button 155 days With a present counter value of 0 days the message SERVICE IN and an audible sig...

Page 16: ... SERVICE SETUP STOP DELAY EXIT 2x SERVICE INTERVAL SERVICE RESET BACK PASSWORD _ _ _ _ _ _ SERVICE DAY SERVICE PRE FILTER SERVICE POST FILTER BACK SERVICE DAY SERVICE PRE FILTER SERVICE POST FILTER BACK SERVICE DAY SERVICE PRE FILTER SERVICE POST FILTER BACK SERVICE DAY SERVICE PRE FILTER SERVICE POST FILTER BACK PASSWORD ...

Page 17: ... the AUTO RINSE selection menu Fig 18 SET RINSING HOUR Time setting for automatic rinsing START RINSING Starts of the manual rinsing manually BACK Quit menu and back to selection menu Fig 18 Menu Level 1 AUTO RINSE DThe menu item SET RINSING HOUR is active Automatic interval rinsing SET RINSING HOUR The menu SET RINSING HOUR allows a automatic interval rinsing at a set time that has to be programm...

Page 18: ... to wait briefly approx 30s before turning the RO unit on again 4 2 Trouble shooting guide Please observe If your reverse osmosis is not performing as it should please run through the alarm messages below In the event of a fault repair work may only be carried out by an expert SERVICE technician Alarm malfunction list Possible reasons Acknowledgement SERVICE 1 SERVICE s Carrying out service work D...

Page 19: ...VICE team FAULT 2 5 FAULT 2 Pump fuse s Pump defective fuse protection s OTOR FAULT CHECK OPERATING PARAMETERS s Pump is mechanically blocked or damaged D Call SERVICE team D Replacement of pump motor FAULT 3 6 FAULT 3 Pressure sensor permeate s 0RESSURE SENSOR DEFECTIVE PERMEATE s ABLE CONNECTION DEFECTIVE OR INPROPER WIRE rupture D Call SERVICE team D Replacement of pressure sensor FAULT 4 7 FAU...

Page 20: ...interval General visual inspection Customer Weekly Check of tightness Customer Weekly Cleaning with a moist cloth Customer As required Conductivity value of measuring device Customer service At least once a year Exchange of the pre filter insert Customer service At least 2 times a year Exchange RO membrane elements Service At least once a year Exchange of high pressure pump head Service Every 2 ye...

Page 21: ...y be car ried out at authorised WEEE recycling centres EN 2002 96 EC 5 2 Cleaning Clean the reverse osmosis device only with a moist cloth and mild detergents Use cloths without any fibres For the protection of the surface of the device please do not use bleaches solvents alcohol 5 3 Installation of the WCF kits The water conversion factor WCF states how large the produ ced permeate quantity is in...

Page 22: ...0 Feed water flow inlet l h t 100 150 t 200 400 t 267 533 Concentrate flow drain l h t 40 90 t 80 280 t 107 373 Feed water pressure bar 2 0 6 0 2 0 6 0 2 0 6 0 Feed water ambient temperature min max ª 5 30 5 40 5 30 5 40 5 30 5 40 RON AND MANGANESE E N mg l 0 05 0 05 0 05 Silica SiO2 mg l 15 15 15 Salt level Total Dissolved Solids TDS mg l 500 500 500 Silt Density Index SDI min 3 3 3 Oxidants mg l...

Page 23: ...hen fill out the following table at every initial and further installation and archive the data sheet Parameter Value set at installation Description DATE Day month year Current date TIME Hours minutes Current time LANGUAGE Language selection Active language English STOP PRESSURE bar Online Pmax 4 0 bar Offline Pmax 2 0 bar RINSING HOUR TIME 23 30 03 00 Default setting 02 00 a m Actual software ve...

Page 24: ...designed manufactured and assembled according to the following EC Directives guidelines 2004 108 EC Guideline for electromagnetic compatibility EMC 2006 95 EC h OW 6OLTAGE IRECTIVEh the following harmonised guidelines were applied EN 61000 6 1 EN 61000 6 3 EN 60335 The following national guidelines were applied UÊÊ 6 7 Guideline for drinking water hygiene scope of law in Austria UÊÊ 6 7 Guideline ...

Page 25: ...stomers to enjoy the highest levels of safety hygiene and health in their daily use of water the precious elixir of life Among these are SEP TRON VJG YQTNFoU ƂTUV NGEVTQFGKQPKUCVKQP OQFWNG YKVJ spiral winding the MDA manganese oxide activation method for effective removal of manganese AQA total bipolar technol ogy for chemical free limescale protection SANISAL the YQTNFoU ƂTUV TGIGPGTCVKQP UCNV HQ...

Reviews: