
- 13 -
Steps 31 through 48 are for installing the 15 and 6 meter parts to the antenna. Use the following
diagram to assist in identifying the parts and their proper locations.
On tubes E, F and G, the
hole that is drilled 5/8” from the end goes toward the top of the antenna.
31. Position wire clamp 0.875" 15M with insulator (K) around tube (F) and use a # 8 x 1" screw,
lock washer and hex nut. Tighten just finger tight. Final adjustment will be done in a later step.
32. Slide wire clamp 0.875" 6M with insulator (V) around tube (F).
33. Insert the end of tube (G) into the end of tube (F) and secure with a # 8 x 1 1/4" screw, lock
washer and hex nut.
34. Position wire clamp 0.750" 6M with insulator (U) around tube (G).
35. Locate wire clamp 0.750" 15M with insulator (N) and position it around tube (G). Final
tightening and positioning will be done in a later step.