![background image](http://html1.mh-extra.com/html/bush-hog/phdf20-2/phdf20-2_operators-manual_2834862036.webp)
OPERATION
PHDHF / PHDHC 03/20
Operation Section 4-2
© 2020 Alamo Group Inc.
O
PE
R
AT
IO
N
BUSH HOG PHDHF15, PHDHF20 PHDHF30
BUSH HOG PHDHF15-2, PHDHF20-2, PHDHF30-2, PHDHF35
BUSH HOG PHDHC20, PHDHC30, PHDHC35
PLANETARY DRIVE DIGGER OPERATION INSTRUCTIONS
The Bush Hog F-Series hydraulic auger drives are available in three models for systems operating between 6
and 30 GPM and 2000 to 3000 PSI. F-Series auger drives are designed with a planetary gearbox to eliminate
chain and sprocket reductions found on drives in this class and price range.
The Bush Hog F-2 Series hydraulic auger drives are available in four models for systems operating between 5
and 35 GPM and 2000 to 3500 PSI. F-2 series auger drives are designed with a planetary gearbox to eliminate
chain and sprocket reductions found on drives in this class and price range.
The rugged F-Series and F-2 Series drive will give better service since all rotating parts are sealed away from
harmful dirt and debris, and fully running in oil. These compact units are designed to give exceptional service
under average digging conditions. The auger rotation can be reversed to free it if it becomes caught under an
obstruction. The F-Series unit are ideal for light to moderate drilling applications.
The Bush Hog C-Series hydraulic auger drives are available in three models for systems operating between 10
and 35 GPM and 2000 to 3000 PSI. The C-Series planetary outperforms and has heavier components than
any of its competitors. Mounting frame mounts to all modern skid loaders with the universal attach system. The
C-Series units are ideal for the toughest applications, from dirt to solid rock and concrete when paired with the
correct C-Series auger. The Bolt-on Shaft reduces downtime and costly repairs due to bent or broken shafts.
This section of the Operator’s Manual is designed to familiarize, instruct, and educate safe and proper
implement use to the operator. Pictures contained in this section are intended to be used as a visual aid to
assist in explaining the operation of a digger. Some pictures may show shields removed for purposes of clarity.
NEVER OPERATE this implement without all shields in place and in good operational condition. The operator
must be familiar with the implement and tractor operation and all associated safety practices before operating
the implement and tractor. Proper operation of the digger, as detailed in this manual, will help ensure years of
safe and satisfactory use of the implement.
IMPORTANT:
To avoid implement damage, retorque all bolts after the first 10 hours of operation.
READ AND UNDERSTAND THE ENTIRE OPERATING INSTRUCTIONS AND SAFETY SECTION OF THIS
MANUAL AND THE POWER UNIT MANUAL BEFORE ATTEMPTING TO USE THE POWER UNIT AND
IMPLEMENT.
If you do not understand any of the instructions, contact your nearest authorized dealer for a
full explanation. Pay close attention to all safety signs and safety messages contained in this manual and
those affixed to the implement and power unit.
OPS-UPI- 0001
READ, UNDERSTAND, and FOLLOW the following Safety Messages. Serious injury or
death may occur unless care is taken to follow the warnings and instructions stated in the
Safety Messages. Always use good common sense to avoid hazards.
(SG-2)
Si no lee ingles, pida ayuda a alguien que si lo lea para que le traduzca las
medidas de seguridad.
(SG-3)
Summary of Contents for PHDF20-2
Page 4: ...STORAGE 5 3 HYDRAULIC LINES COUPLERS ADAPTERS 5 4 PROPER TORQUE FOR FASTENERS 5 4 ...
Page 5: ...Safety Section 1 1 SAFETY SECTION ...
Page 20: ...SAFETY PHDHF PHDHC 03 20 Safety Section 1 16 2020 Alamo Group Inc SAFETY Decal Description ...
Page 21: ...SAFETY PHDHF PHDHC 03 20 Safety Section 1 17 2020 Alamo Group Inc SAFETY ...
Page 23: ...Introduction Section 2 1 2020 Alamo Group Inc INTRODUCTION SECTION ...
Page 30: ......
Page 31: ...Assembly Section 3 1 ASSEMBLY SECTION ...
Page 35: ...Operation Section 4 1 OPERATION SECTION ...
Page 57: ...Maintenance Section 5 1 MAINTENANCE SECTION ...
Page 61: ...MAINTENANCE PHDHF PHDHC 03 20 Maintenance Section 5 5 2020 Alamo Group Inc MAINTENANCE ...
Page 62: ......