OPERATION
2547 01/11
Operation Section 4-30
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADING FROM A BANK
Choose a forward gear that provides sufficient
ground speed for loading.
Exercise caution when undercutting high banks.
Dirt slides can be dangerous. Load from as low as
possible for maximum efficiency. Loader lift and
breakaway capacity diminish as loading height is
increased.
Side cutting is a good technique for cutting down a
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Summary of Contents for 2547
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 34: ......
Page 35: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 48: ......
Page 49: ...Operation Section 4 1 OPERATION SECTION...
Page 93: ...Maintenance Section 5 1 MAINTENANCE SECTION...
Page 103: ...MAINTENANCE 2547 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 104: ...MAINTENANCE 2547 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Page 105: ......
Page 108: ...2547 SOM 01 11 P N 50069204 Printed U S A 2547 LOADER...