MAINTENANCE
2297 01/11
Maintenance Section 5-4
© 2011 Alamo Group Inc.
MAINTENANCE
Lubrication Schedule
Before operating your Loader, take the time to inspect and repair any damage to the machine or tractor. Only a
minimum of time and effort is required to regularly maintain this machine to provide long life and trouble free
operation.
Lubricate all grease fittings: one at each end of lift boom arms and one at rod and base ends of each lift and
bucket cylinders.
NOTE:
Fully retract bucket to a comfortable height to grease bucket/loader boom joint. Do not reach or stand
under a raised loader or attachment without proper support.
Summary of Contents for 2297
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 32: ......
Page 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 43: ...Operation Section 4 1 OPERATION SECTION...
Page 85: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 94: ...MAINTENANCE 2297 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE...
Page 95: ...MAINTENANCE 2297 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 98: ...2297 SOM 01 11 P N 50069201 Printed U S A 2297 LOADER...