![background image](http://html1.mh-extra.com/html/bush-hog/2297/2297_operators-manual_2834550072.webp)
OPERATION
2297 01/11
Operation Section 4-30
© 2011 Alamo Group Inc.
OPERA
T
ION
It is important to keep the bucket level when
approaching a bank or pile. This will help prevent
gouging the work area.
PEELING AND SCRAPING
Use a slight bucket angle, travel forward and hold
lift control forward to start the cut. Make a short 5 to
8 foot angle cut and break out cleanly.
With bucket level, start a cut at notch approximately
2 inches deep. Hold depth by feathering bucket
control to adjust cutting lip up or down. When front
tires enter the notch, adjust lift cylinder to maintain
proper depth.
Summary of Contents for 2297
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 27: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 32: ......
Page 33: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 43: ...Operation Section 4 1 OPERATION SECTION...
Page 85: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 94: ...MAINTENANCE 2297 01 11 Maintenance Section 5 10 2011 Alamo Group Inc MAINTENANCE...
Page 95: ...MAINTENANCE 2297 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 98: ...2297 SOM 01 11 P N 50069201 Printed U S A 2297 LOADER...