![background image](http://html1.mh-extra.com/html/bush-hog/1945/1945_operators-manual_2834544076.webp)
OPERATION
1945 01/11
Operation Section 4-30
© 2011 Alamo Group Inc.
OPERA
T
ION
LOADING FROM A BANK
Choose a forward gear that provides sufficient
ground speed for loading.
Exercise caution when undercutting high banks.
Dirt slides can be dangerous. Load from as low as
possible for maximum efficiency. Loader lift and
breakaway capacity diminish as loading height is
increased.
Side cutting is a good technique for cutting down a
big pile.
If the pile sides are too high and liable to cause
cave-in, use loader to break down the sides until a
slot can be cut over the top.
Summary of Contents for 1945
Page 5: ...Safety Section 1 1 SAFETY SECTION...
Page 29: ...Introduction Section 2 1 INTRODUCTION SECTION...
Page 34: ...INTRODUCTION 1945 01 11 Introduction Section 2 6 2011 Alamo Group Inc INTRODUCTION...
Page 35: ......
Page 36: ...INTRODUCTION 1945 01 11 Introduction Section 2 8 2011 Alamo Group Inc INTRODUCTION...
Page 37: ...Assembly Section 3 1 ASSEMBLY AND CONNECTING THE LOADER SECTION...
Page 47: ...Operation Section 4 1 OPERATION SECTION...
Page 91: ...Maintenance Section 5 1 2011 Alamo Group Inc MAINTENANCE SECTION...
Page 101: ...MAINTENANCE 1945 01 11 Maintenance Section 5 11 2011 Alamo Group Inc MAINTENANCE...
Page 102: ...MAINTENANCE 1945 01 11 Maintenance Section 5 12 2011 Alamo Group Inc MAINTENANCE...
Page 103: ......
Page 106: ...1945 SOM 01 11 P N 50069161 Printed U S A 1945 LOADER...