Maintenance | 8
Instruction Manual R5 RA 0063 F5K_EN_en
19 | 32
8.1
Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The intervals
given below are considered as starting values which should be shortened or extended as appropri-
ate. Particularly harsh applications or heavy duty operation, such as high dust loads in the environ-
ment or in the process gas, other contamination or ingress of process material, can make it neces-
sary to shorten the maintenance intervals significantly.
Maintenance work
Interval
Normal application
Harsh application
●
Check the oil level, see
Daily
●
Check the machine for oil leaks - in case of
leaks have the machine repaired (contact Bus-
ch).
In case of an inlet filter being installed:
●
Check the inlet filter cartridge, replace if neces-
sary.
Monthly
●
Change the oil*, the oil filter* (OF) and the ex-
haust filters (EF).
Max. after 4000 hours,
at the latest after 1
year
Max. after 2000
hours, at the latest
after 6 months
●
Clean the machine from dust and dirt.
In case of a gas ballast valve (GB) being installed:
●
Clean the gas ballast valve.
If the machine is equipped with an air-oil heat ex-
changer (AHE):
●
Check and/or clean the air-oil heat exchanger.
Every 6 months
●
Contact Busch for an inspection.
If required, overhaul the machine.
Every 5 years
* Service interval for synthetic oil, shorten the interval when using mineral oil, contact Busch Service
8.2
Oil Level Inspection
●
Shut down the machine.
●
When the machine is stopped, wait 1 minute before checking the oil level.
MAX
MIN
MAX
MIN
MAX
MIN
●
12].