7 | Maintenance
12 / 24
0870569132_SV_SD_DC1010-1040C_-0005_IM_en
7
Maintenance
WARNING
Machines contaminated with hazardous material.
Risk of poisoning!
Risk of infection!
If the machine is contaminated with hazardous material:
• Wear appropriate personal protective equipment.
CAUTION
Hot surface.
Risk of burns!
• Prior to any action requiring touching the machine, let the machine cool down first.
NOTICE
Using inappropriate cleaners.
Risk of removing safety stickers and protective paint!
• Do not use incompatible solvents to clean the machine.
CAUTION
Failing to properly maintain the machine.
Risk of injuries!
Risk of premature failure and loss of efficiency!
• Respect the maintenance intervals or ask your Busch representative for service.
• Shut down the machine and lock against inadvertent start up.
• Vent the connected lines to atmospheric pressure.
If necessary:
• Disconnect all connections.
7.1 Maintenance Schedule
The maintenance intervals depend very much on the individual operating conditions. The
intervals given below are considered as starting values which should be shortened or ex-
tended as appropriate. Particularly harsh applications or heavy duty operation, such as
high dust loads in the environment or in the process gas, other contamination or ingress of
process material, can make it necessary to shorten the maintenance intervals significantly.
Material of Vanes
Interval
Maintenance work
Zirkon
Monthly
• Clean the machine from dust and dirt.
In case of an inlet filter being installed:
• Check the inlet filter cartridge, re-
place if necessary.
EK-60
Zirkon
Every 8000 hours, at
the least once a year
• Check the vanes (VA) and change
them if necessary.
• Change the internal filters (IIF / IDF)
• Change the felt washer (FW) of the
discharge valve (DV) (only on SV
series)
EK-60
Every 3000 hours, at
the least once a year