Table of Contents
2 / 32
0870573045_NC1500B_VR_A0002_IM_en
Table of Contents
5.1 Installation Conditions .......................................................................................... 9
5.2 Connecting Lines / Pipes ...................................................................................... 10
5.2.1 Suction Connection....................................................................................10
5.2.2 Discharge Connection................................................................................11
5.2.3 Cooling Liquid Connection.........................................................................11
5.3 Earth Connection.................................................................................................. 11
5.4 Filling Oil .............................................................................................................. 12
5.5 Fitting the Coupling.............................................................................................. 14
5.6.1 Wiring Diagram Three-Phase Motor (Pump Drive).....................................16
5.7.1 Wiring Diagram Resistance Thermometer ..................................................17
7.1 Maintenance Schedule.......................................................................................... 21
7.2 Oil Level Inspection .............................................................................................. 22
7.3 Oil Change ........................................................................................................... 22
7.4 Checking the Liquid Return System ...................................................................... 25