7 | Commissioning
22 | 40
Instruction Manual COBRA NC 1000 B WCV_EN_en
●
After a few minutes of operation, perform an
●
After a few minutes of operation, perform a
Cooling Liquid Level Inspection
As soon as the machine is operated under normal operating conditions:
●
Measure the motor current and record it as reference for future maintenance and trouble-
shooting work.
7.1
Conveying Condensable Vapors
The machine, equipped either with a gas ballast valve or a dilution gas system, is suitable for the
conveyance of condensable vapors within the gas flow.
If condensable vapors are to be conveyed:
START
●
Open the gas ballast valve* or the dilution gas system* (solenoid valve)
●
Warm up the machine
●
Wait 30 minutes
●
Open the inlet valve
●
Perform the process
●
Close the inlet valve
●
Wait 30 minutes
●
Close the gas ballast valve* or the dilution gas system* (solenoid valve)
END
* optional accessories
●
Continuously drain condensate from the condensate drain plug (CD) of the silencer (SI) (Optional).