Commissioning | 7
Instruction Manual COBRA BA 0100 C_EN_en
21 | 36
7.1
Conveying Condensable Vapors
The machine, equipped with a dilution gas sytem, is suitable for the conveyance of condensable va-
por within the gas flow.
START
●
Open the dilution gas valve (DGV)
●
Start the machine to warm it up
●
Wait 30 minutes
●
Open the inlet valve
●
Perform the process
●
Close the inlet valve
●
Wait 30 minutes
●
Stop the nitrogen supply
●
Stop the machine
END
7.2
Restart Procedure
If the machine has stopped unintentionally:
●
Find out why the machine has stopped and solve the problem, see Troubleshooting [
30].
●
Let the machine cool down (approx. 1 hour).
●
Switch on the motor safety switch (MSS).
●
Start up the machine again with the main switch (MSH).