Double Ceiling Version Installation
Ceiling Support Structure
The engineer of record for the building shall provide a support structure designed to support
weights and forces shown on the Equipment Anchorage Diagrams on page 19. When the support
structure is in place the static inspection sheet on page 18 should be filled out and stored for future
reference
.
Installing the Junction Box
The junction box should normally be placed on top of the support structure. Make sure the screw
holes on the junction box plate correspond to the holes in the ceiling casting. When the ceiling
plate is installed, the bolts will also hold the junction box.
If there isn’t space for the junction box on top of the support structure, another suitable location in
the ceiling can be used. It is also possible to use a different junction box if that is more convenient.
See wiring diagram on page 11:
Switch wiring (contractor-supplied) must be minimum AWG 18 from the switch to the terminal
block. Wiring and conduit must meet the NEC, local, and national fire protection codes.
Installing the Ceiling Casting
Note: Illustration is for single ceiling version, so only one transformer and a smaller terminal block is shown.
1.
The static inspection sheet on page 18 has to be filled out and signed by a certified engineer or
Construction Authority before mounting the ceiling casting.