e.  A hot water boiler installed above radiation level 

must be provided with a low water cutoff device 
as part of the installation.

 

If a low water cut-off is required, it must be 
mounted in the system piping above the boiler.  
The minimum safe water level of a hot water 
boiler is just above the highest water containing 
cavity of the boiler; that is, a hot water boiler 
must be full of water to operate safely.

f.  Use a boiler bypass if the boiler is to be 

operated in a system which has a large volume 
or excessive radiation where low boiler water 
temperature may be encountered (i.e., converted 
gravity circulation system, etc.).  The bypass 
should be the same size as the supply and return 
lines with valves located in the by-pass and 
supply outlet as illustrated in order to regulate 
water fl ow for maintenance of higher boiler 
water temperatures.  See Figure 6.

 

Set the by-pass and boiler supply valves to a 
half throttle position to start.  Operate boiler 
until the system water temperature is at a normal 
operating range.

 

Adjust the valves to provide 180° to 200°F 
supply water temperature.  Opening the boiler 
supply valve will raise the system temperature, 
while opening the by-pass valve will lower the 
system supply temperature.

 

If it is required to perform a long term pressure 
test of the hydronic system, the boiler should fi rst 
be isolated to avoid a pressure loss due to the 
escape of air trapped in the boiler.

 

To perform a long term pressure test including 
the boiler, ALL trapped air must fi rst be removed 
from the boiler.

 

A loss of pressure during such a test, with no 
visible water leakage, is an indication that the 
boiler contained trapped air.

INSTALL BOILER FLUSH JACKET (See Figure 
9).

a.   Open jacket carton and locate side panels.  Note that 

jacket left side panel is not insulated and right side 
panel is insulated.

b.   Position the rear fl ange on jacket left side panel 

behind the boiler back plate.  Position fl ange support 
notches over jacket support hooks on back panel 
and engage jacket on both support hooks to keep the 
panel from moving front to rear.

c.   Position rear fl ange on jacket right side panel behind 

upper and lower jacket support brackets.  Engage 
jacket with jacket support hooks in similar manner 
as left side panel to provide proper positioning and 
support.

d.   Take jacket top and bottom panel from carton.  Top 

panel can be identifi ed by the front channel used to 

Figure 6

RECOMMENDED BOILER PIPING

Summary of Contents for SM-6

Page 1: ...l i o B e d i v o r p r e l i o b r e b m u N l e d o M r e l i o B r e b m u N l a i r e S r e l i o B e t a D n o i t a l l a t s n I _ _ _ _ _ _ _ M S _ _ _ _ _ _ _ 6 r o t c a r t n o C g n i t a...

Page 2: ...of the installing contractor to see that all controls are operating properly when the installation is completed Service on this boiler should be undertaken only by trained and skilled personnel Post...

Page 3: ...NLY Figure 1 SPACEMASTER WALL MOUNTED GAS BOILER DIMENSIONAL DATA I General Installation Requirements 4 II Installation Instructions 7 III Operating Instructions 13 IV Service 23 V Repair Parts 26 VI...

Page 4: ...ers Therefore adequate supports must be added between existing studding b A suggested mounting height where practical is five feet six inches from floor to center line of intake air duct opening See F...

Page 5: ...r area which has adequate air supply shall be provided One opening should be near the floor and the other near the ceiling Each shall have a free area of not less than one 1 square inch for each thous...

Page 6: ...0 0 1 0 5 3 0 1 5 9 1 5 2 1 4 4 3 9 5 7 1 0 5 1 0 4 4 8 0 6 1 5 7 1 7 3 7 7 5 4 1 r o f I I d n a I s e l b a T h t i w d e s u e b o t s r e i l p i t l u M 0 6 0 n a h T r e h t O y t i v a r G c i...

Page 7: ...oiler mounting wall bracket on wall using a 24 level across top corners level wall bracket and secure to wall with suitable fasteners h Attach lower R S jacket mounting bracket to right side of boiler...

Page 8: ...e gasket is in place and flat against back plate Attach duct with four 4 20 brass hex nuts lockwashers and flat washers 3 INSTALLING EXTERIOR TELESCOPING INTAKE AIR DUCT See Figures 4 and 5 a Position...

Page 9: ...ng stainless steel machine screws provided 5 DO NOT REPLACE ENCLOSURE COVER until boiler piping is completed and system is filled vented and checked for water leaks 6 CONNECT SUPPLY AND RETURN PIPING...

Page 10: ...y valve will raise the system temperature while opening the by pass valve will lower the system supply temperature If it is required to perform a long term pressure test of the hydronic system the boi...

Page 11: ...11 Figure 7 RECOMMENDED PIPING FOR COMBINATION HEATING COOLING REFRIGERATION SYSTEMS Figure 9 EXPLODED JACKET ASSEMBLY...

Page 12: ...be influenced by drafts hot or cold water pipes lighting fixtures television rays of the sun or near a fireplace Keep large furniture away from thermostat so there will be free movement of room air ar...

Page 13: ...s have been purged but always have one zone open At completion open all zone valves 10 Close drain valve on purge fitting 11 Continue filling the system until the pressure gauge reads 12 psi Close fil...

Page 14: ...14 NOTE YOUR BOILER IS EQUIPPED WITH A HONEYWELL VR8204 OR VR8304 GAS VALVE PLEASE FOLLOW THESE OPERATING INSTRUCTIONS...

Page 15: ...15 Figure 11 SCHEMATIC WIRING DIAGRAM...

Page 16: ...16 Figure 12 LADDER WIRING DIAGRAM...

Page 17: ...regulator on the gas valve will permit full flow through the main gas valve high fire Should a loss of flame occur the main valve closes and the spark reoccurs within 0 8 second The ignition module h...

Page 18: ...nstalled in the 1 8 pipe tapping in the gas valve boiler off By installing gas valve up stream of manometer gas pressure can be introduced gradually without shutoff valve surge of pressure when boiler...

Page 19: ...19...

Page 20: ...20...

Page 21: ...21...

Page 22: ...lead from electrical junction block If burners are not shut down by module determine cause of malfunction Replace module or gas valve if necessary 10 MAIN BURNER FLAMES should have a clearly defined...

Page 23: ...r and jacket front panel If the flue passageways need cleaning remove burners as described in paragraph 4 below Using long handle wire or bristle flue brush and vacuum brush flueways thoroughly from t...

Page 24: ...attention to solder joints on bellows and float when this type of control is used Check float for evidence of collapse and check mercury bulb where applicable for mercury separation or discoloration P...

Page 25: ...thing 3 Gloves 4 Eye Protection Take steps to assure adequate ventilation Wash all exposed body areas gently with soap and water after contact Wash work clothes separately from other laundry and rinse...

Page 26: ...5 5 0 6 1 1 8 n a F s e d u l c n I y l b m e s s A t n e m e c a l p e R n a F t f a r D d e c u d n I s t e k s a G t e l t u O n a F 2 o w t d n a t e k s a G t e l n I n a F t e k s a G t e l t u...

Page 27: ...either the supply or return piping The minimum safe water level of a water boiler is at the uppermost top of the boiler that is it must be full of water to operate safely What Kind Typically in resid...

Page 28: ...HTS AND YOU MAY ALSO HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE Limited Warranty FOR RESIDENTIAL CAST IRON WATER BOILERS 03 03 Subject to the terms and conditions set forth below U S Boiler Co I...

Reviews: