
17
6. Install air intake terminal. See Figure 13.
7. Seal all external joints with weatherproof caulk.
D.
Air Intake Installation (Indoor Air for Combustion)
1. Remove the black plastic inlet cover from the right
side of the Beckett AFII burner.
2. Attach the Air Intake Terminal directly to the burner
intake collar.
3. Discard the Vacuum Relief Valve.
Alternate to 1., 2. and 3.:
Keep the black plastic inlet cover in place and
discard the Air Intake Terminal and the Vacuum
Relief Valve.
Summary of Contents for LEDV SERIES
Page 14: ...14 Figure 10 Vent Installation Figure 11 Vent Connector Un Assembled ...
Page 15: ...15 Figure 13 Air Intake Installation Figure 12 Vent Connector Assembled ...
Page 19: ...19 Figure 15 Schematic Wiring Diagram ...
Page 28: ...28 Service Notes ...
Page 30: ...30 Figure 19 LEDV Boiler Trim Controls ...
Page 31: ...31 Figure 20 LEDV Boiler Jacket Insulation ...
Page 32: ...32 Figure 21 LEDV Bare Boiler Assembly ...
Page 33: ...33 Figure 22 Vent Kit Repair Parts ...
Page 36: ...36 ...