
1
Price - $3.00
INSTALLATION, OPERATING AND
SERVICE INSTRUCTIONS FOR
LEDV SERIES DIRECT VENT
OIL FIRED BOILER
81433101R3-3/00
As an ENERGY STAR Partner, Burnham Corporation has determined that the LEDV-1, fired at the 0.60 GPH rate,
meets the ENERGY STAR guidelines for Energy efficiency established by the United States Environmental Protection
Agency (EPA).
For service or repairs to boiler, call your heating contractor. When seeking information on boiler, provide
Boiler Model Number and Serial Number as shown on Rating Label.
Boiler Model Number
LEDV__ - _______
Boiler Serial Number
6 _ _ _ _ _ _ _
Installation Date
Heating Contractor
Phone Number
Address
Summary of Contents for LEDV SERIES
Page 14: ...14 Figure 10 Vent Installation Figure 11 Vent Connector Un Assembled ...
Page 15: ...15 Figure 13 Air Intake Installation Figure 12 Vent Connector Assembled ...
Page 19: ...19 Figure 15 Schematic Wiring Diagram ...
Page 28: ...28 Service Notes ...
Page 30: ...30 Figure 19 LEDV Boiler Trim Controls ...
Page 31: ...31 Figure 20 LEDV Boiler Jacket Insulation ...
Page 32: ...32 Figure 21 LEDV Bare Boiler Assembly ...
Page 33: ...33 Figure 22 Vent Kit Repair Parts ...
Page 36: ...36 ...