Page 21 of 46
21 of 46
3.2.1 Plug Assignment of the Control Unit
1 backrest motor
2 thigh rest motor
3 total height
4 foot end height
motor
HB handset
3.3 PUTTING INTO SERVICE
Each time, before putting the bed into service, the user must check
that:
-
the bed castors are braked (see chapter 4.4).
-
the power supply is compatible with the bed (230 Volt, 50 Hertz).
-
the mains cable is connected and routed such that it cannot be
damaged.
-
the mains cable, the motor cable and handset cable cannot be
damaged by moving parts of the nursing bed.
-
no obstacles such as night tables, floor cable ducts or chairs will
inhibit adjustments.
-
all adjustment functions are in proper working order and have been
checked (see chapter 6.1).
Only now the bed may be put into operation
.
Summary of Contents for ARMINIA II
Page 1: ...Page 1 of 46 ...
Page 11: ...Page 11 of 46 ...
Page 36: ...Page 36 of 46 ...
Page 37: ...Page 37 of 46 ...