background image

B

1 - 5

INSTALLATION INSTRUCTIONS

The radiator can be installed in three different heating configurations; connected to a central heating 
system, fitted with a summer electric heating kit as an electric radiator, or as a dual source connected 
to a central heating system and with a summer electric heating kit fitted.

PLEASE NOTE: THE CHAPLIN RADIATORS ARE MADE FROM STEEL AND WHEN CONNECTED TO 

CENTRAL HEATING SYSTEMS SHOULD ONLY BE USED ON CLOSED SYSTEMS CONTAINING A RUST 

INHIBITOR. 

- review instructions carefully before installation
- installation should be completed by a suitably qualified person
- please dispose of packaging in a responsible manner

POSITION:

The radiator, if intended to be heated with the summer electric heating kit, can be installed in the Zone 2 
area (see Fig below), but the electrical connection box must be outside the Zone 2 area.

Zone 1

Zone 2

Zone 0

225cm

Zone 1

60cm

Zone 1

Zone 2

225cm

60cm

Zone 1

Zone 0

Zone 2

60cm

60cm

Zone 0

(1) Side view, bath

(2) Top view

(3) Side view, shower

PLEASE NOTE:

  This product can only be used at PN

1MPa (10Kg/cm, 10Bar). It should only be filled with a water 

    mixture containing a rust inhibitor, and at a temperature below 100°C (or 212°F). See table below 
    for installation requirements. 

  If the temperature exceeds 48°C (or 120°F), please install a warning sign near the product to avoid 

    burning or scalding accidents.

0

°C

 

t

100

°C

  If the product is not used for a period during which ambient temperature drops below 5°C (or 41°F), 

    please drain the water out of the radiator to avoid oxidization. 

  For prolonged usage and safe operation please check product at regular intervals.

°C

Water mixture

containing a  

rust inhibitor

AFTER CARE ...

The Chaplin radiators are made from steel with chrome plating, and should not be cleaned with 
corrosive or scouring cleaning agents.

Chaplin      R12 CHR

Summary of Contents for chaplin r12 chr

Page 1: ...ection box must be outside the Zone 2 area Zone 1 Zone 2 Zone 0 225cm Zone 1 60cm Zone 1 Zone 2 225cm 60cm Zone 1 Zone 0 Zone 2 60cm 60cm Zone 0 1 Side view bath 2 Top view 3 Side view shower PLEASE NOTE This product can only be used at PN 1MPa 10Kg cm 10Bar It should only be filled with a water mixture containing a rust inhibitor and at a temperature below 100 C or 212 F See table below for insta...

Page 2: ...B 2 5 Ø8mm Tools required Parts supplied Installation position is determined by installer 1 ST4 8 45mm 12x 12x 2x 1x Ø8mm 2 3 ...

Page 3: ...ted with the central heating system After installation Use a screwdriver to open the air vent open the inlet valve and let the water rush into the radiator Check all connections for leaks Once water overflows from the air vent there is no air in the tube use a screwdriver to close the air vent Turn on the outlet valve and the radiator is ready for use 4 5 6 ...

Page 4: ...ot connected to a central heating system then seal the bottom inlet outlet nipples with the blanking plugs Fill the radiator approximately 90 with a water mixture containing a rust inhibitor failure to do this will lead to leaking as the radiator rusts from the inside Filling with more than 90 liquid will lead to leaking as the water mixture expands as it heats up After installation Use a screwdri...

Page 5: ...re for reference only and should be purchased separately If this radiator used as a dual source connected to central heating system and with a summer electric heating kit fitted While use central heating system power supply must be shut off and release the air in radiator as described in page 3 While use summer electric heating kit only turn off the inlet and outlet valves and make sure the liquid...

Reviews: