
2702 - 13
C
ommissioning
english
InstallatIon of the valve ......................................................................................................................... 14
Procedure for Top
Control
Procedure for Side
Control
PneUMatIC InstallatIon foR toP
CONTROL
tYPe 8630
...................................................17
Fluid connections of the Top
Control
eleCtRICal ConneCtIon - MUltIPole ConneCtoRs
(toP
CONTROL
Output signals for SPS (circular plug M 16) ..........................................................................................................19
Operating voltage (circular plug M 12) ...................................................................................................................19
eleCtRICal ConneCtIon - teRMInals foR Cable bUshIng
(toP
CONTROL
Connection PCB of the TOP
Control
Continuous with screw terminals and jumpers ..................................21
Terminal configuration with cable bushings ............................................................................................................21
Choice of binary outputs or process value input ...................................................................................................22
settIng the IndUCtIve PRoxIMItY swItChes
(oPtIon foR toP
Opening the housing of the TOP
Control
Continuous..........................................................................................23
eleCtRICal ConneCtIon - teRMInal foR Cable bUshIng
(sIde
CONTROL
Commissioning
Summary of Contents for 2702
Page 93: ......
Page 94: ...www burkert com ...