background image

4

INITIAL SET-UP

1.  Open the top lid. Clear all foreign objects and shipping material  from the hopper compartment and the en-

trance to the grind chamber.

2.  Plug in the grinder.

3.  Fill the hopper compartments with whole bean coffee. (Capacity 6 pounds each). The grinder is now ready 

for use.

d

d

c

b

a

OPERATING CONTROLS

Grind Pad (a)

 

Pressing the 

GRIND

 button initiates a timed grind cycle.

Stop Pad (b)

 

Pressing the 

STOP

 button ends the operation of the grinder.

® PAD (c)

 

Pressing the 

®

 pad allows programming access (see page 6).

Hopper/Batch Selector Pads (d)

 

These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads.  Selecting 

one of these pads will select the amount of grind and side from which to grind.

 

Example:  Selecting the lower pad on the left side will grind enough beans from the left side of the grinder 

to brew the amount programmed into grinder.

Power ON/OFF Pad (e) (100V Models)

 

Pressing the ON/OFF pad alternately turns the grinder on and off.

Control Board

 

 

The control board determines the amount of beans that will leave the hopper in a grind cycle. The timer por-

tion can be adjusted to dispense a different amount from each hopper and each batch size. The scale is from 0.4 

to 99.9 seconds.  Refer to the Adjustments section for timer setting chart (page 8).

e

33736  030205

Summary of Contents for G9-2T DBC

Page 1: ... obtain the Illustrated Parts Catalog visit the Bunn O Matic website at www bunn com This is absolutely FREE and the quickest way to obtain the catalog Contact Bunn O Matic Corporation at 1 800 286 6070 to obtain a paper copy of the required Illustrated Parts Catalog mailed via U S Postal Service www bunnomatic com INSTALLATION OPERATING MANUAL G9 2T DBC for use with Smart FunnelTM 33736 0000F 05 ...

Page 2: ...the defective equipment prepaid to an authorized BUNN service location and 3 receiving prior authorization from BUNN that the defective equipment is under warranty THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY WRITTEN OR ORAL EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE The agents deale...

Page 3: ...ached cordset and requires 2 wire grounded service rated 120 volts ac 9 amp single phase 60 Hz for 120 volt models 2 wire grounded service rated 230 volts ac 4 amp single phase 50 Hz for 230 volt models 2 wire grounded service rated 100 volts ac 9 amp single phase 50 Hz for 100 volt models NOTE If the power cord is damaged it must be replaced by the manufacturer or its service agent or a similarly...

Page 4: ... are located on the funnel depictions on each side of the grinder with a total of 6 pads Selecting one of these pads will select the amount of grind and side from which to grind Example Selecting the lower pad on the left side will grind enough beans from the left side of the grinder to brew the amount programmed into grinder Power ON OFF Pad e 100V Models Pressing the ON OFF pad alternately turns...

Page 5: ...dispensed Any adjustment of the burrs should be followed by an adjustment of the timer Burr Adjustment 1 Unplug the grinder and empty all beans from the hoppers 2 Plug in the grinder press and release the GRIND button with either hopper selected Run a few grind cycles until all of the coffee in the grind chamber is used 3 Remove the upper front inspection panel 4 Loosen the locknut by one turn 5 P...

Page 6: ...represents the name of the coffee that is to be loaded into the hopper 2 Press and release the GRIND button to increase the number or press and release the STOP button to decrease it 3 When the correct number for the coffee being used is displayed press any of the batch buttons on the other side All three indicators on that side will begin flashing 4 Repeat step 2 to enter the name for the coffee ...

Page 7: ...nel then insert the funnel into the brewer funnel rails 2 The display will read the coffee name that was ground into the funnel 3 If this name is different from the name on the chart the grinder s memory needs to be reset Resetting the grinder memory to match the chart below 1 Unplug grinder from the outlet 2 Press in and hold both the STOP and the GRIND buttons and plug cordset into the outlet Af...

Page 8: ...Use the table below to find approximate timer setting for the grind and amount of coffee desired 3 To enter the setup mode and make an adjustment press and hold the hidden programming pad under the One of the batch indicators will begin to flash off and on At this point release the button 4 Push the hopper batch selector button for the batch to be adjusted Note that the digital display shows the c...

Page 9: ... 33736 030205 ...

Page 10: ...10 33736 030205 ...

Reviews: