Bunn DUAL / GPR-DBC Installation & Operating Manual Download Page 7

Page 7

SET READY - Range: 185˚F (85˚C) to 203˚F (95˚C)

 

This function allows the operator to set the minimum temperature allowable to start a brew cycle. The range 

can be from 185˚F (85˚C) to within 2˚F (-1.7°C) of the SET TEMP. The water must be at the SET READY tempera-

ture or higher for the display to indicate READY TO BREW. If brew lockout is enabled, the brewing process will 

not start below this READY temperature.

NOTE: The upper limit for SET READY temperature is 2˚F (-1.7°C) less than the water temperature (SET TEMP) 

setting.

Procedure to set ready temperature:

1.  Press and hold upper right hidden switch until the display reads UNITS. Release switch.  Press and release 

upper right hidden switch until the display reads SET READY.

2.  To adjust the ready temperature, press the (-) button to decrease, or (+) to increase the ready temperature.

3.  When finished, press and release DONE to save the new setting, exit the SET READY function and advance 

to the next function screen, REFILL. Another alternative is to press and release either ON/OFF switch located 

on the front switch panel to exit the SET READY function and return to the MAIN SCREEN.

COFFEE BREWING

1.  Select the desired batch size on the grinder.  It is not necessary to select a size on the brewer.

2.  Insert a BUNN filter into the funnel.

3.  Pour the proper amount of fresh ground coffee into the filter and level the grounds by gently shaking.

4.  Slide the funnel into the funnel rails. If the grounds are not obtained through a grinder compatible with a 

Smart Funnel, a batch size must be chosen on the brewer.

5.  Place an empty server under the funnel.

6  The ENABLE BREW switch must be ON.  Momentarily press and release the BREW switch.  If the brewer has 

the funnel lock option and if it is activated, once a brew cycle has been started the funnel is locked in place. 

There may be certain situations in which the brew cycle will not begin when the BREW switch is pressed:

 

a)   BREW TEMPERATURE TOO LOW - wait until heated or cancel BREW LOCKOUT option.

 

b)   FUNNEL NOT IN PLACE (or using a standard brew funnel) - cancel FUNNEL DETECT option.

 c) 

CHECK FUNNEL - remove funnel, empty previously brewed grounds and grind a new batch into the funnel. 

 

7.  If none of the above messages are displayed, the display will read NOW BREWING and the time remaining 

in the brew cycle.  Arrows will point to the side which is brewing.  If both sides are brewing simultaneously, 

the arrows will alternate from left to right on the display.

8.  Following the BREW will be a countdown of drip time DRIPPING which shows the time remaining until the 

funnel lock will release. Discard the grounds and filter only after visible dripping stops.

SET READY: XXX°

 (-)  DONE  (+)

TEMPERATURE SELECTION (cont)

37614.1 031512

Summary of Contents for DUAL / GPR-DBC

Page 1: ...t www bunn com This is absolutely FREE and the quickest way to obtain the latest catalog and manual updates Contact Bunn O Matic Corporation at 1 800 286 6070 to obtain a paper copy of the required Il...

Page 2: ...prepaid to an authorized BUNN service location and 3 receiving prior authorization from BUNN that the defective equipment is under warranty THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OT...

Page 3: ...LOW NATIONAL AND LOCAL ELECTRICAL CODES KEEP COMBUSTIBLES AWAY FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE FIRE OR SHOCK HAZARD READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT 00986 0000F 10 0...

Page 4: ...he brewer is ready for Initial Set Up PLUMBING REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi 138 and 620 kPa from a 1 2 or larger supp...

Page 5: ...the flow of water Pressing this switch during the programming of the brewer will exit the setup and return to the main screen d BREW SWITCH Momentarily pressing and releasing this switch begins a brew...

Page 6: ...asmallvesselbeneaththefaucetandopenthefaucet handle Release it when you hear the tank refilling 6 Water volumes have been preset at the factory Refer to adjustments for the Set Brew Volumes section of...

Page 7: ...a BUNN filter into the funnel 3 Pour the proper amount of fresh ground coffee into the filter and level the grounds by gently shaking 4 Slide the funnel into the funnel rails If the grounds are not o...

Page 8: ...ts from the sprayhead holes 3 Insert the long end of sprayhead cleaning tool into the sprayhead fitting and rotate several times to remove any mineral deposits from the fitting 4 Insert the short end...

Reviews: