Bunn DUAL / GPR-DBC Installation & Operating Manual Download Page 3

Page 3

00656.0001

00986.0000

00658.0000

20201.5600

USER NOTICES

The notices on this brewer should be kept in good condition.  Replace unreadable or damaged labels.

37881.0000

03408.0004

03409.0004

Artwork for P/N:  39803.0000
Artwork Rev:  A
Drawn:  REF
Date:  02/26/07

MAIN ON/OFF

SWITCH

39803.0000

12364.0000

37614.1 031512

WARNING

• DO NOT OVERLOAD CIRCUIT.
• ALWAYS ELECTRICALLY GROUND
  THE CHASSIS.
• DO NOT DEFORM PLUG OR CORD.
• FOLLOW NATIONAL AND LOCAL
  ELECTRICAL CODES.
• KEEP COMBUSTIBLES AWAY.

FAILURE TO COMPLY RISKS EQUIPMENT

DAMAGE, FIRE OR SHOCK HAZARD.

READ THE ENTIRE

OPERATING MANUAL BEFORE

USING THIS PRODUCT

00986.0000F  10/07   ©1994  Bunn-O-Matic Corporation

As directed in the International Plumbing Code of the 

International  Code  Council  and  the  Food  Code 

Manual of the Food and Drug Administration (FDA), 

this  equipment  must  be  installed  with  adequate 

backflow  prevention  to  comply  with  federal,  state 

and  local  codes.  For  models  installed  outside  the 

U.S.A., you must comply with the applicable Plumb-

ing /Sanitation Code for your area.

00824.0002

Summary of Contents for DUAL / GPR-DBC

Page 1: ...t www bunn com This is absolutely FREE and the quickest way to obtain the latest catalog and manual updates Contact Bunn O Matic Corporation at 1 800 286 6070 to obtain a paper copy of the required Il...

Page 2: ...prepaid to an authorized BUNN service location and 3 receiving prior authorization from BUNN that the defective equipment is under warranty THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OT...

Page 3: ...LOW NATIONAL AND LOCAL ELECTRICAL CODES KEEP COMBUSTIBLES AWAY FAILURE TO COMPLY RISKS EQUIPMENT DAMAGE FIRE OR SHOCK HAZARD READ THE ENTIRE OPERATING MANUAL BEFORE USING THIS PRODUCT 00986 0000F 10 0...

Page 4: ...he brewer is ready for Initial Set Up PLUMBING REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi 138 and 620 kPa from a 1 2 or larger supp...

Page 5: ...the flow of water Pressing this switch during the programming of the brewer will exit the setup and return to the main screen d BREW SWITCH Momentarily pressing and releasing this switch begins a brew...

Page 6: ...asmallvesselbeneaththefaucetandopenthefaucet handle Release it when you hear the tank refilling 6 Water volumes have been preset at the factory Refer to adjustments for the Set Brew Volumes section of...

Page 7: ...a BUNN filter into the funnel 3 Pour the proper amount of fresh ground coffee into the filter and level the grounds by gently shaking 4 Slide the funnel into the funnel rails If the grounds are not o...

Page 8: ...ts from the sprayhead holes 3 Insert the long end of sprayhead cleaning tool into the sprayhead fitting and rotate several times to remove any mineral deposits from the fitting 4 Insert the short end...

Reviews: