©2012 Bullard. All rights reserved..
6088001030C (0612)
ISO 9001
certified
Bullard
1898 Safety Way
Cynthiana, KY 41031-9303
Toll free: 877-BULLARD (285-5273)
Tel: 859-234-6616
Fax: 859-234-8987
www.bullard.com
Bullard gmbh
Lilienthalstrasse 12
53424 Remagen
Germany
phone: 0049-2642 999980
fax : 0049-2642 9999829
www.bullard.com/europe
Bullard asia pacific pte. ltd.
LHK Building
701, Sims Drive, #04-03
Singapore 387383
Tel: (65) 6745-0556
Fax: (65) 6745-5176
www.bullard.com
air Fed Vest climate control
ac1000dc/cT30dc user Manual
Operating the ac1000dc/cT30dc
9. To obtain cooler air, turn the air temperature knob
clockwise. If the knob is fully closed, the vest will
receive air at ambient temperature. maximum cooling
is attained when knob is fully opened and when there
is maximum airflow out of the exhaust port of the
cool tube.
10. When finished working, disconnect the air supply hose
using the quick-disconnect coupler attached to the
cool tube.
Cooling vest
DC70m/L
DC70XL/XXL
Velcro
strips
“V” notch
CH1000 Cooling vest
connector hose
AC1000DC/CT30DC
4612 belt
warNINg