background image

©2012 Bullard. All rights reserved..

6088001030C (0612)

ISO 9001  

certified

Bullard

1898 Safety Way
Cynthiana, KY  41031-9303
Toll free: 877-BULLARD (285-5273)
Tel: 859-234-6616
Fax: 859-234-8987

www.bullard.com

Bullard gmbh

Lilienthalstrasse 12
53424 Remagen
Germany
phone: 0049-2642 999980
fax : 0049-2642 9999829

www.bullard.com/europe

Bullard asia pacific pte. ltd.

LHK Building
701, Sims Drive, #04-03
Singapore 387383
Tel:  (65) 6745-0556 
Fax:  (65) 6745-5176 

www.bullard.com

air Fed Vest climate control 

ac1000dc/cT30dc user Manual

Operating the ac1000dc/cT30dc

9.  To obtain cooler air, turn the air temperature knob 

clockwise. If the knob is fully closed, the vest will 
receive air at ambient temperature. maximum cooling 
is attained when knob is fully opened and when there 
is maximum airflow out of the exhaust port of the  
cool  tube. 

10.  When finished working, disconnect the air supply hose 

using the quick-disconnect coupler attached to the 
cool tube.

Cooling vest 

DC70m/L 

DC70XL/XXL

Velcro 

strips

“V” notch

CH1000 Cooling vest 

connector hose

AC1000DC/CT30DC

4612 belt

warNINg

Reviews: