Getting Started With Your System
3
Installation and Configuration
WARNING:
Before performing the following procedure, review the safety
instructions that came with the system.
Unpacking the System
Unpack your system and identify each item.
Installing the Rails and System in a Rack
CAUTION:
If installed in a closed or multi-unit rack assembly, the operating
ambient temperature of the rack environment may be greater than room ambient.
Therefore, consideration should be given to installing the equipment in an
environment compatible with the maximum ambient temperature (Tma) specified
by the manufacturer. For more information, see "Technical Specifications"
on page 11.
Assemble the rails and install the system in the rack following the safety
instructions and the rack installation instructions provided with your system.
Summary of Contents for NovaScale R410B F2
Page 2: ......
Page 5: ...Getting Started With Your System ...
Page 19: ...Getting Started With Your System 15 ...
Page 20: ...16 Getting Started With Your System ...
Page 21: ...Guide de mise en route ...
Page 35: ...Guide de mise en route 31 ...
Page 36: ...32 Guide de mise en route ...
Page 37: ......
Page 38: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 X1 46FG 01 ...