Bukh DV36 ME Owner'S Handbook Manual Download Page 18

OPERATING MANUAL FOR BUKH DV36ME ENGINES 

009W0327-R03 

- 18 - 

BUKH DISTRIBUTORS – WORLDWIDE 

 

 

 

Fiala & Cia. S.R.L. 
Av. Presidente Roque Saenz Peña 710 
Piso 3º “D” 
1035  Buenos Aires 
ARGENTINA 

Tel: +54-11-4328-1474 / 6280 
Fax: +54-11-4328-2838 
E-mail: 

[email protected]

 

 

Bukh Diesel Australia Pty. Ltd. 
P.O. Box 448 
Caringbah, N.S.W. 1495 

AUSTRALIA 

Tel: +61-2-9525-0011 
Fax: +61-2-9526-1084 
E-mail: 

[email protected]  

Website: 

www.bukhdiesel.com.au

 

Contact: Gary Townsend 

Greenland Engineers & Tractors Company Ltd (GETCO) 
GPO Box 541 
Dhaka 100 
BANGLADESH 

Tel: +880-2-812164 / 812175 
Fax: +880-2-813319 
E-mail: 

[email protected]

  

Contact: Syed Taskin Saleheen, Assistant Manager 

Chimtec Ltd 
Baza Himsnab 
9181 Razdelna 
Port Varna West 8211 

BULGARIA 

Tel: +359-8882-80563 
Fax: +359-5483-0090 
E-mail: 

[email protected]

 

Contact: Deian Tachev, Manager 

Crinmar 
873 Apple Down Drive 
Kingston, Ontario K7P 1C7 

CANADA 

Tel: +1-613-634-8100 
Fax:  +1-613-634-8110 
E-mail: 

[email protected]

 

Contact: Keith A Strutt 

Chile Services Management 
1001 Francia Av. 
Valparaíso 

CHILE 

Tel: +56-32-210766 / 211652 
Fax: +56-32-228995 
E-mail: 

[email protected] 

Website:

 www.csmchile.cl

 

Contact: Andre Quint, Technical Manager 

Fibronaval 
Calle General Lagos N

o

 1049 

Valdivia 

CHILE 

Tel: +56-63-210869 
Fax: +56-63-208404 
E-mail: 

[email protected]

 

Contact: Jesús Brieva 

Forwin Company Ltd, Qinhuangdao Office 
No 1-11, Nongken Building 
Shanhaiguan Development Zone 
Hebai 

CHINA

 066206 

Tel: +86-335-5082-500 
Fax: +86-335-5085-036 
E-mail: 

[email protected]

 

For Win Equipment & Engineering Co Ltd 
Beijing Office 
Room 205, House Hao Bai C2 Block Building 
No 50 Xisanhuanbeilu 
Beijing 

CHINA

 100044 

Tel: +86-10-8851-5498 
Fax: +86-10-8851-7458 
E-mail: 

[email protected]

 

Forwin Company Ltd, Shanghai Office 
Room 201, No 23, Lane 1299,  
Zhou jiia zui Road 
Shanghai 

CHINA

 200082 

Tel: +86-21-6504-5055 
Fax: +86-21-6504-49381 
E-mail: 

[email protected]

 

E-mail: 

[email protected]

  

Forwin Company Ltd, Guangzhou Office 
Room 1701, Block B5, Fuli Plaza 
8 Road Zhongshan, Liwan District 
Guangzhu, Guangdong 

CHINA

 510140 

Tel: +86-20-8135-6891 
Fax: +86-20-8135-6896 
E-mail: 

[email protected]

 

Forwin Company Ltd, Tianjin Office 
Room 602, No 37 
Xiaoyuan Xincun, Teda 
Tianjin 

CHINA

 300457 

Tel: +86-22-6620-1973 
Fax: +86-22-6620-1509 
E-mail: 

[email protected]

 

Forwin Company Ltd, Dalian Office 
1-2-3, No 155, Xue Shi Street 
Zhon Shan District 
Dalian, Liaoning 

CHINA

 116001 

Tel: +86-411-2719-395 
Fax: +86-411-2719-929 
E-mail: 

[email protected]

 

Forwin Company Ltd, Wuhan Office 
Room 2202, D. Tai Chang Flats 
518 Jiefang Road, wuchang 
Wuhan, Hubei 

CHINA  

Tel: +86-27-8885-1625 
Fax: +86-27-8885-2147 
E-mail: 

[email protected]

 

Wei Marine Shanghai Co Ltd 
Room 19G, No 2000 Pudong Dadao Road 
Shanghai 200135 

CHINA 

Tel: +86-21-5132-7372 / 3 / 4 / 5 / 6 / 7 
Fax: +86-21-5132-7368 
E-mail: 

[email protected]

 

E-mail: 

[email protected]

 

 

Summary of Contents for DV36 ME

Page 1: ...009W0327 R03 OWNER S HANDBOOK FOR BUKH MARINE DIESEL LIFEBOAT ENGINE TYPE DV36 ME BUKH A S Aabenraavej 13 17 DK 6340 Krusaa Tel 45 74 62 20 88 Fax 45 74 62 74 07 E mail bukh bukh dk www bukh dk...

Page 2: ...oil system 7 Change of oil 7 Recommended lubricating oil 7 Change of lubricating oil filter 7 Cooling water system 7 Seawater cooling 7 Exchange of zinc anode 7 Exchange of impeller 7 Freshwater cooli...

Page 3: ...ear 17 Housing for vacuum valve 18 Bilge pump for change of lub oil 19 Bracket for control cable 20 Electric multi plug 21 Fuel lift pump 22 Lifting fittings 23 Water cooled exhaust manifold 24 Zinc a...

Page 4: ...e state Engine type and serial number description and number of parts BUKH A S Powering Marine Safety As BUKH A S is always endeavouring to improve the engines the specifications mentioned are subject...

Page 5: ...it will not be necessary to bleed the fuel system before starting but after changing the fuel filter element or carrying out any work on the fuel system it should be bled in the following way Loosen t...

Page 6: ...left in this position after the engine has stopped due to the large current consumption of the stop solonoid In this position the acoustic alarm will function when the engine has stopped 4 Turn off th...

Page 7: ...urther half turn 5 Fill with oil until normal level is reached 6 Start the engine and check that the filter is tight Cooling water system Normally the engine is direct seawater cooled however alternat...

Page 8: ...d are exhausted and have evaporated 2 Oxidation due to incoming air causing an acid which is lowering the PH value Therefore and also to keep the anti freezing properties it is recommended to change t...

Page 9: ...the drive enabling the oil to run out Refill the fresh oil to a quantity of 3 3 ltr through the filter hole B at the top of the drive corresponding to the upper mark on the dipstick A Use the same qua...

Page 10: ...rrosion check the electrical connections A good way of fitting the sacrificial zinc is to fold down one of its flaps and to clamp it to thestern bearing by means of a rustproof clip as shown on the sk...

Page 11: ...ry place during the winter 5 A For freshwater cooled engines 6 Drain the freshwater from the engine by removing the plugs as indicated for seawater cooled engines It is not necessary to flush this sys...

Page 12: ...EL FILTER THROW AWAY FILTER INSERT FUEL QUALITY GAS OIL BS 2869 CLASS A LUBRICATING SYSTEM TYPE OF LUBRICATING OIL PUMP ROTARY VANE PUMP LUBRICATING OIL PRESSURE WARM ENGINE MINIMUM 2 4 5 Bar 1 Bar LU...

Page 13: ...nsert renew insert X 6 2 sufficient water flow to rear stern tube bearing check that water holes in bearing housing are not blocked clean holes X 6 3 alignment of gear flange and prop shaft flange ali...

Page 14: ...orrectly adjusted or something in the system works sluggishly Adjust the governor Check governor system and correct the error Hot engine smell of heat Insufficient cooling water supply Stop engine Che...

Page 15: ...XON ESSO ESSOLUBE XT301 SAE 15W 40 API CG 4 FZG11 EXXON ESSO SPARTAN EP220 ISO VG 220 X EXXON ESSO GEAROIL GX SAE 80W 90 X MOBIL OIL MOBIL 1 0W 40 SAE 0W 40 API SJ CF EC X X X X MOBIL OIL MOBIL Delvac...

Page 16: ...OPERATING MANUAL FOR BUKH DV36ME ENGINES 009W0327 R03 16...

Page 17: ...OPERATING MANUAL FOR BUKH DV36ME ENGINES 009W0327 R03 17 Installation DV36...

Page 18: ...mpany Ltd Qinhuangdao Office No 1 11 Nongken Building Shanhaiguan Development Zone Hebai CHINA 066206 Tel 86 335 5082 500 Fax 86 335 5085 036 E mail forwin heinfo net For Win Equipment Engineering Co...

Page 19: ...774 5260 Fax 358 10 774 5269 E mail tero erkinheimo alamarinjet com E mail tuula kakkuri alamarinjet com Website www alamarinjet com Contact Tero Erkinheimo Tuula Kakkuri DIAM S Les Trois Rivi res 41...

Page 20: ...R Permall Somabri 21 Boulevard Lahcen Ouidder Casablanca 20 200 MOROCCO Tel 212 2 2312056 2445014 Fax 212 2 2445051 2443801 E mail kelmo casanet net ma Contact Khaddach el Mostafa The Engine Room Limi...

Page 21: ...on Marindiesel Blodboksgatan 26 426 74 V Fr lunda SWEDEN Tel 46 31 293 058 Fax 46 31 694 111 Min Sen Machinery Co Ltd 777 Mahachai Road Wangburapapirom Pranakorn Bangkok 10200 THAILAND Tel 66 2 621100...

Page 22: ...later than the stipulated settling date interest shall be paid on overdue payments at the rate of 1 5 per cent per month or fraction of a month Bukh A S reserves the right to change the rate of inter...

Reviews: