background image

Gas Analysis

Installation and Operation Instructions

Original instructions

Sample gas probes

GAS 222.20 Denox

BE460035
04/2021

Bühler Technologies GmbH, Harkortstr. 29, D-40880 Ratingen

Tel. +49 (0) 21 02 / 49 89-0, Fax: +49 (0) 21 02 / 49 89-20

E-Mail: [email protected]

Internet: www.buehler-technologies.com

Summary of Contents for GAS 222.20 Denox

Page 1: ...riginal instructions Sample gas probes GAS 222 20 Denox BE460035 04 2021 B hler Technologies GmbH Harkortstr 29 D 40880 Ratingen Tel 49 0 21 02 49 89 0 Fax 49 0 21 02 49 89 20 E Mail analyse buehler t...

Page 2: ...this instruction carefully prior to installation and or use Pay at tention particularly to all advises and safety instructions to prevent in juries B hler Technologies can not be held responsible for...

Page 3: ...ration and controls 11 5 1 Basic function of the probe controller 11 5 1 1 Controller function 11 5 2 Use of menu functions 11 5 2 1 Menu navigation overview 12 5 2 2 Detailed description of the opera...

Page 4: ...lling the device verify the listed technical data meet the application parameters Further check if all contents are complete Please refer to the nameplate to identify your model In addition to the job...

Page 5: ...3 1 4 4 1 4 check valve Anti free heater 0 without anti free heater 1 with anti free heater Connections 1 Left 2 Right 1 5 Product description Probe Description GAS 222 20 Denox Probe with outlet fil...

Page 6: ...o modify specifications without advanced notice Keep this manual for later use Signal words for warnings DANGER Signal word for an imminent danger with high risk resulting in severe injuries or death...

Page 7: ...re part If necessary visually inspect prior to installation to determine any obvious damage to the spare parts Always observe the applicable safety and operating regulations in the respective country...

Page 8: ...se auxiliary means for transport and assembly Avoid damage to the product Treat the product with caution Ensure that the product is fastened with wall brackets which comply with DIN EN 61010 1 If the...

Page 9: ...ust be protected from shock and impact If the probe is transported to the installation site in pieces it will first need to be assembled 4 2 Installing the sampling tube optional The sampling tube if...

Page 10: ...FE sleeve The PTFE side must face the glass thread The sample gas line must be braced and secured with the clamp Long sample gas lines may require additional support clamps along the way to the analys...

Page 11: ...by another recognised testing body Electric strength test This unit is equipped with extensive EMC protection Testing the electric strength will damage electronic filter components The necessary tests...

Page 12: ...lled in the mains connection cable or interrupt the protective conductor and must disconnect all current carrying conductors It must be installed in the vicinity of the system be easily accessible and...

Page 13: ...er This is described in chapter Operation and use The factory settings are Unit C Sample probe temperature 280 C operating range 10 C Heated adapter 160 C operating range 10 C 5 2 Use of menu function...

Page 14: ...ange 50 C 280 C 122 F 536 F Setting the display unit Available in Celsius or Fahrenheit Display Temperature Exit Exit Display Top Settings Alarm Probe temperature ____ Setting range Setting the alarm...

Page 15: ...automatically return you to the submenu If no button is pushed for approx 5 s the unit will automatically return to the submenu Changes to values will not be saved The same applies to the sub and mai...

Page 16: ...submenu 1 Display Submenu E Selecting this will return you to the main menu 5 3 3 Submenu for controller for heated adapter display Adon Controller Nominal temperature Temperature This item allows se...

Page 17: ...surface Risk of burns Depending on the operating parameters the housing temperature may reach over 100 C during operation Allow the unit to cool down before performing maintenance CAUTION Excess pres...

Page 18: ...reeze protection heating Allow the heating to cool down before performing maintenance Close the gas supply Switch off and unplug the device Loosen the 4 screws at the maintenance cover and remove the...

Page 19: ...ir the fault immediately The device should not be turned on again before elim ination of the failure Problem malfunction Possible cause Action No or reduced gas flow Filter element plugged Clean or re...

Page 20: ...rts Item no Description 46 222 024 O ring kit for filter element and probe material Perfluorelastomer 46 222 026P Filter element ceramic 3 m perfluor 46 222 010P Filter element sintered VA 5 m perfluo...

Page 21: ...posal Dispose of parts so as not to endanger the health or environment Follow the laws in the country of use for disposing of elec tronic components and devices during disposal 19 B hler Technologies...

Page 22: ...ptional anti freeze heater Electrical data 230 V 50 Hz 650 W 3 A 115 V 60 Hz 650 W 6 A IP rating IP44 Parts in contact with media 1 4571 glass PVDF Norprene Viton PTFE the ambient temperature upper li...

Page 23: ...power supply Mains Probe heater Probe temperature status Pt100 heated adapter Pt100 probe Add on power supply heated adapter Heater frost guard condensate pump factory wired connection by customer Fi...

Page 24: ...GAS 222 20 Denox 10 Attached documents Drawings 46 135 Z01 02 1 46 135 Z01 01 1 Declaration of Conformity KX460023 RMA Decontamination Statement 22 B hler Technologies GmbH BE460035 04 2021...

Page 25: ...tab 1 2 5 Ers f r B A C G3 4 E 27 7 Kondensatpumpe condensate pump F Option Frostschutzheizung option frost protection heating Glasbeh lter glass vessel Gasentnahmesonde sample gas probe Steuerung con...

Page 26: ...tab 1 2 5 Ers f r B A C 126 355 112 296 G3 4 E 27 7 Kondensatpumpe condensate pump F Messgas Aus sample gas out G Option Frostschutzheizung option frost protection heating Glasbeh lter glass vessel Ga...

Page 27: ......

Page 28: ...aminated Ja kontaminiert mit Yes contaminated with explosiv explosive entz ndlich flammable brandf rdernd oxidizing komprimierte Gase compressed gases tzend caustic giftig Lebensgefahr poisonous risk...

Page 29: ...rsetzen Sie vor der Inbetrieb nahme die Verkabelung wieder in den urspr nglichen Zustand Fragen Sie im Zweifel beim Hersteller nach weiteren Informationen Analysing defective assemblies is an essentia...

Reviews: