Placing Tank in Operation
5
11
We reserve the right to make any changes due to technical modifications!
Installation and Maintenance Instructions Logalux S 120 „US“• Issue 07/2001
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
5
Placing Tank in Operation
Prior to start-up, verify that the tank is filled with water
and that the cold feed is functional and unrestricted.
Check all connections for leaks.
Information regarding boiler/burner operation start-
up can be found in their respective manuals
The complete system must be placed in operation by
the installing contractor or one of his associates in
the presence of the end user. The end user shall be
informed about start-up procedure and system ope-
ration.