![Buderus Logalux LTD950 Installation Instructions For Contractors Download Page 10](http://html.mh-extra.com/html/buderus/logalux-ltd950/logalux-ltd950_installation-instructions-for-contractors_2826420010.webp)
4
Transport
Logalux LTN/LTD/LTH/LF 400...3000 – 6 720 818 806 (2015/12)
10
4
Transport
The DHW cylinder can be transported with a pallet truck or a crane.
Transport by crane
▶ Hook the lifting hooks on the cables into the two eyelets [1].
▶ Hook the lifting hook of the crane into the cable.
▶ Set the DHW cylinder down gently.
Fig. 4
Eyelets on the DHW cylinder
[1]
Eyelets
5
Fitting
5.1
Installation
5.1.1
Installation location
5.1.2
Positioning the DHW cylinder
▶ Position the DHW cylinder on a level floor that has adequate load-
bearing capacity.
▶ Observe the minimum clearances in the installation location for
maintenance, fitting and repair (
▶ Ensure that the clearance from the top edge of the DHW cylinder to
the ceiling is not less than 500 mm.
▶ Align the DHW cylinder so that it is horizontal and stable.
Insert metal shims underneath if necessary.
▶ In the case of double and triple cylinders, fasten the storage cylinders
together before fitting the thermal insulation.
▶ In the case of triple cylinders, ensure that the cylinder feet are
secured.
Fig. 5
Minimum clearances
DANGER:
Risk to life through falling load!
▶ Only use lifting cables that are in a faultless condition.
▶ Only hook the lifting hooks into the eyelets provided.
NOTICE:
Risk of damage from inappropriate securing
during transport!
▶ Use only suitable means of transport for handling the
load.
NOTICE:
Risk of system damage due to frost!
The system can freeze up during frost, if it is not in
operation.
▶ Only install the DHW cylinder in a frost-proof room,
or drain a cylinder that is not in use, if there is a risk
of frost.
Rated content
Wall clearance
[l]
A, [mm]
B, [mm]
400...550
900
1100
750...3000
1200
1700
Table 7 Minimum clearances
> 1m
6 720 817 906-04.1T
Summary of Contents for Logalux LTD950
Page 24: ......