Installation
5
pump group Logamax plus GB162-65/80/100 - Subject to modifications resulting from technical improvements!
17
Connect the mains cable connector (fig. 22
, item 1
)
to the pump.
5.9
Installing the insulation cover
Feed the insulation cover with its upper edge into the
groove in the lower support (fig. 23).
fig. 21
Laying the pump connection leads
Item 1:
Pump connection cable
fig. 22
Connecting the pump
Item 1:
Mains cable connector
1
1
fig. 23
Installing the insulation cover
NOTE
The door over the boiler control panel must
be closed.