Installation
5
pump group Logamax plus GB162-65/80/100 - Subject to modifications resulting from technical improvements!
16
Undo 1 screw to release the cover over the electrical
connections and pull the cover up (fig. 19).
Lay the pump connection cable from the boiler
through the hole under the electrical connection box
downwards (see fig. 20,
item 1
and fig. 21,
item 1
).
fig. 19
Pulling the cover over the electrical connections up
fig. 20
Laying the pump connection cable
Item 1:
Pump connection cable
1