Buderus G201 Operating Instructions Manual Download Page 11

4

Start-up and operation

Logano G201 - Subject to technical modifications.

11

4.2.1

Checking the operating pressure

Your heating contractor will have set the system to the 
required operating pressure of at least 15 psi (1 bar) and 
entered the setting in Tab. 3, page 12.

V

Read off the current operating pressure and tempera-
ture from the temperature/pressure gauge.

V

If the temperature/pressure gauge needle drops below 
the minimum pressure of 15 psi, the operating pressure 
is too low. Add water to the system.

Fig. 4

Pressure/temperature gauge

4.2.2

Topping up the heating water and bleeding 
the heating system

Ask your heating contractor to show you where the boiler 
fill & drain valve for topping up the heating system is 
located in your heating system.

V

Connect the hose to the water tap. Push a hose filled 
with water onto the hose connection of the boiler fill & 
drain valve, fasten with a hose clip, and open the boiler 
fill & drain valve.

V

Slowly fill the heating system. Observe the pressure 
gauge (pressure/temperature gauge) while doing so.

V

Close the water tap and the boiler fill & drain valve once 
the required operating pressure has been reached.

V

Bleed the heating system via the purge valves on the 
boiler piping.

V

Top up with additional water if the pressure drops as a 
result of bleeding the system.

V

Remove the hose from the boiler fill & drain valve. 

7 747 010 720-24.2RS

WARNING: 

Risk to health due to pollution of 

drinking water!

V

Always observe the regulations and stan-
dards applicable in your jurisdiction for the 
prevention of contamination of drinking 
water (e.g. by water from heating sys-
tems).

CAUTION: 

Risk of damage to system due to 

temperature stress!
If you fill the heating system when it is hot, the 
resulting temperature stresses can cause 
stress cracks. The boiler will then leak.

V

Only fill the heating system when cold (the 
flow temperature should be no more than 
100 °F).

Summary of Contents for G201

Page 1: ...age or loss of life and serious injury Do not store or use gasoline or any other flam mable liquids or vapors in the vicinity of this system or any other heating system The heating system must only be...

Page 2: ...table reliably for a long time We manufacture using the latest technologies and take care that our products are efficiently attuned to one another Operating efficiency and environmental friendli ness...

Page 3: ...correctly 9 4 Start up and operation 10 4 1 Before operating the appliance 10 4 2 Check operating pressure fill up the heating water and bleed the heating system 10 4 2 1 Checking the operating press...

Page 4: ...not modify any parts that carry flue gas V Do not operate the appliance without water V Always keep system openings doors maintenance cover fill openings closed during operation V Only use approved f...

Page 5: ...re that this temperature limit is adhered to with a suitable set up V The minimum boiler water temperature must be above 131 F because with a lower temperature steam can condense This has negative con...

Page 6: ...l modifications 6 2 5 Disposal V Packing materials made of wood and paper can be burned in the boiler V Dispose of packaging in an environmentally responsi ble manner V Dispose of old devices in an en...

Page 7: ...eded The fuel filler door 3 allows you to fill the ignition cham ber with fuel The ignition chamber transmits the heat generated to the heating water The ash container is behind the ash pan door 2 The...

Page 8: ...g up the cold boiler water condenses in the boiler which runs down on the interior walls This way you might think that the boiler is draining off This sweat ing of the boiler ends as soon as the ashes...

Page 9: ...entilated room Fig 3 Wood storage outdoors 3 4 2 Storing coal correctly Coal is suitable for storage outside of and inside of build ings For safe storage the following conditions for the storage locat...

Page 10: ...as content This causes air pockets to form and the heating water starts to make noises V With new heating systems check the operating pres sure daily at first topping up the heating water and bleeding...

Page 11: ...the boiler fill drain valve fasten with a hose clip and open the boiler fill drain valve V Slowly fill the heating system Observe the pressure gauge pressure temperature gauge while doing so V Close...

Page 12: ...top up the heating water fre quently the heating system may suffer dam age from corrosion or scaling depending on the water quality V Ask your heating contractor if the local wa ter can be used untre...

Page 13: ...e stop V Remove the segment plate 1 Fig 7 Removing the segment plate 1 Segment plate 2 Bolt V To increase the draft of the boiler open the exhaust flap Fig 8 Open the exhaust flap WARNING Risk of syst...

Page 14: ...uel V Close the fuel filler door V To prevent heat losses in the chimney close the exhaust flap depending on the flue draft Fig 11 If the flue gases are not drawing properly flue draft is not sufficie...

Page 15: ...the fuel filler door completely V In order to reduce the smoke formation in the boiler room during re filling open the exhaust flap Fig 13 above V Stoke the fire with a poker and insert the desired qu...

Page 16: ...he ashes V Clean the ash pan V Close the ash pan door V Close the fuel filler door 4 10 Shutting down the boiler for a long period When shutting down the boiler for a long period e g at the end of the...

Page 17: ...ance of the heating system maintains its efficiency guar antees high reliability and environmentally friendly combustion The cleaning of the heating system depends on the fuel quality and the environm...

Page 18: ...nd the flue gas header Fig 16 page 19 must be checked monthly and cleaned if necessary Insufficient cleaning can cause damage to the boiler and the voiding of warranty claims Heat exchanger heater flu...

Page 19: ...header and is sealed with the cleaning cover 1 V Unscrew the two wing nuts on the cleaning cover V Carefully remove the cleaning cover 1 V Remove the combustion residues via the inspection aperture V...

Page 20: ...ting contractor and have flue draft return temperature checked Too much condensate forms in the fuel space of the boiler black liquid leaks out of the fuel filler door Boiler output too high Insert le...

Page 21: ...6 Logano G201 Subject to technical modifications 21 Notes...

Page 22: ...6 Logano G201 Subject to technical modifications 22 Notes...

Page 23: ...6 Logano G201 Subject to technical modifications 23 Notes...

Page 24: ......

Reviews: