1.4
Items supplied with unit
z
Check the contents against the packing list to ensure that
nothing is missing.
Requirements to be met by the place of installation
1.5
Hanging the boiler
z
Attach the manifold assembly to the wall (see fig. 5,
item 1).
z
Attach the pipes.
z
Attach the wall bracket.
z
When using a stand-off frame, refer to the manual of the
stand-off frame for the correct mounting instructions.
z
Loosen the retaining screw on the bottom of the
condensing gas boiler.
z
Detach the outer casing of the condensing gas boiler.
z
Hang the condensing gas boiler onto the wall bracket
(fig. 5).
Fig. 4
Items supplied with unit
Key to fig. 4:
1:
Wall-mounted condensing gas boiler
2:
Wall bracket
3:
Technical documents
4:
Manifold assembly
5:
Filling loop
6:
Plastic bag containing the following accessories:
4 x wall fixing-screws
4 x wall plugs
4 x washers
Seals (1 x 1“, 2 x ¾“, 2 x ½“)
Square wrench
Initial start-up sticker
Second identification plate
Safety valve nipple (from ¾“ to ½“)
4
1
2
3
6
5
NOTE
Observe all statutory building regulations
applying to the place of installation.
DANGER!
Inflammable materials or liquids must not be
stored or used near wall-mounted condensing
gas boilers. The site of installation must be
frost-protected.
CAUTION
DO NOT remove the polystyrene foam bottom
slab protecting the connection nozzles.
During installation work, cover the wall-
mounted condensing gas boiler and the flue
gas adapter to prevent site dirt from entering,
e. g. using aluminium foil.
Fig. 5
Installation
1
NOTE
If the boiler isn't connected to the pipework
immediately, place caps on the pipe
connections.