background image

2

Preface

Subject to modifications resulting from technical improvements!

Operating instructions for Buderus 600 - 11R /19R / 24R • Edition 08/2003

Boulter Buderus Ltd. • http://www.boulter-boilers.com

1

Introduction

Dear Customer,

Your Buderus 

600 Series 

wall-mounted condensing gas 

boiler has been designed and built in accordance with 
state-of-the-art technological standards and the 
recognised safety rules. Special focus has been placed 
on operator convenience in this respect.

Carefully read the safety instructions and operating 
manual to ensure safe, economic and ecologically 
beneficial use of the unit.

Due to the high efficiency of the boiler a plume of water 
vapour may form at the terminal during operation. 
This is normal.

Important general instructions for use

This device should only be used for its intended purpose 
and in accordance with the operating instructions. It is 
the law and in your own interest, and that of safety that 
this boiler must be installed by a CORGI registered 
installer, in accordance with the relevant requirements of 
the current Gas Safety (Installation and Use) 
Regulations, The Building Regulations, current I.E.E. 
Wiring Regulations and the relevant British Standard 
Codes of Practice.

The device may only be used in combination with the 
units, accessories and spare parts listed in the 
installation and servicing instructions. 
Other combinations of units, accessories and 
consumables are only to be used if they completely fulfil 
the specifications involved, and if system performance 
and safety are not affected in any way.

Subject to technical modifications

As a result of our policy of constant development,
there may be small differences with respect to 
illustrations, functional steps and technical data.

G. C. Aplliance No. :

Buderus 600 - 11R

41-110-21

Buderus 600 - 19R

41-110-22

Buderus 600 - 24R

41-110-23

2

Safety precautions

A

DANGER!
If you smell gas

:

1. No naked flames ! Do not smoke !
2. Avoid sparks ! Do not operate electrical 

switches. Do not use the telephone, plug-in 
devices of any kind or the doorbell!

3. Shut off the main gas supply!
4. Open windows and doors!
5. Warn building occupants and evacuate the

building!

6. Call TRANSCO (under 'GAS' in the telephone 

directory) from outside the building!

I

NOTE

In the event of any other type of incident, shut off 
the main gas supply and electricsupply to the 
appliance and seek assistance from a CORGI 
registered engineer. 

3

Installation area / boiler room

A

DANGER!

The air intake and outlet openings must not be 
reduced in size or closed.

A

DANGER!

Do not store or use inflammable materials or 
liquids near the heating boiler.

I

NOTE

To prevent the boiler from being damaged, care 
must be taken not to contaminate the combustion 
air with halogenated hydrocarbons (e. g. 
contained in aerosol sprays, solvents, detergents, 
paints, and adhesives), or with high quantities of 
dust. The room in which the boiler is installed 
must be frost-proof and be well ventilated.
This appliance must not be operated without the 
casing fitted and forming an adequate seal.
If the boiler is installed in a compartment then the 
compartment must not be used for storage 
purposes.

4

Working in the heating system

A

DANGER !

Only a CORGI registered Engineer is to be 
entrusted with the installation of this boiler, the 
gas supply and the flue connection. 
Commissioning, Servicing and any Repairs must 
be carried out by a competent person ie: 
a CORGI Registered Engineer. 
All CORGI Registered Installers carry a CORGI 
identification card and have a registration 
number. Both should be recorded in your boiler 
logbook. You can check if your installer/engineer 
is registered by telephoning 01256 372300 or by 
writing to:
CORGI, 1 Elmwood, Chineham Business Park, 
Crockford Lane, Basingstoke. RG24 8WG

I

NOTE

It is mandatory to clean and service the system 
once a year ! This includes an inspection of the 
entire system to see if it is in full working order. 
Any faults and defects found in the course of 
inspection must be rectified immediately.

It is recommended to enter into a service contract with 
a specialist company.

Reviews: