2. After locating the center of the hole install the ceiling support box, chimney, flashing and
rain cap using listed chimney only. Only use pipe listed in this manual.
CAUTION
REFER TO CHIMNEY MANUFACTURER’S INSTRUCTIONS FOR ASSEMBLY AND
DISASSEMBLY OF CHIMNEY PARTS. BE SURE TO FOLLOW CHIMNEY INSTRUC-
TIONS FOR PROPER CLEARANCES TO COMBUSTIBLE AND PROPER AIR SPACING
REQUIRED
.
3. Add additional pipe until both of the following are met:
(a) Chimney pipe is 3 feet higher than roof at the point where it penetrates the roof.
(b) Chimney pipe height is at least 2 feet higher than any part of the roof within 10 feet of
the chimney. (See Figure 12.)
4. Next, install a New Buck Corporation chimney connector to the flue of the heater.
5. Using double wall chimney connector, connect the heater to the chimney by following
manufacturer's installation instructions exactly. (See Figure 13.)
CEILING
ROOF
CHIMNEY CONNECTOR
Figure 13