HOW TO LOCATE CHIMNEY EXIT AND INSTALL

 

 

Residential Installation  

    

 

B.  Vertical Wall Exit using (6" Single Wall minimum 24 ga. blued or black  pipe with el-

bow and any Listed 2100° UL HT chimney and Listed 2100° UL HT. T-Box assembly). 
Without optional close clearance  shields and pipe shield. 
NOTE: For minimum clearances  (See Page 10, Figure 6).                                 

1.  Mark plumb line on wall directly behind center of heater. 

(See Page 10, Figure 6). 
NOTE:  When using  6" Single Wall minimum 24ga. blued or black pipe. 
Maintain 18" minimum clearances between pipe and ceiling. 

2.  Place vertical portion of heater pipe and elbow in position and project a point onto 

plumb line  level with center of elbow. 

3.  Measure up so there will be at least 1/4" rise per foot of horizontal connector pipe, 

maintaining clearances to the ceiling as noted in page 9, figure 5. This will give you 
center of  hole for chimney penetration. 

4.  After locating center of penetration, install the tee-box and chimney, as per the chimney 

manufacturers specifications. 

5.  Connect chimney collar to  tee-box using 6" Single Wall minimum  24 ga. blued or 

black pipe. (DO NOT USE GALVANIZED PIPE). Connect each section so crimped  
end faces downward and secure each section to each other using three (3) sheet metal 
screws or rivets. Single wall pipe is to be connected with three (3) sheet metal screws  
rivets to connector collar on heater.(See Page 10, Figure 7). 

Summary of Contents for 21 ELITE

Page 1: ...INSTRUCTIONS CONTACT THE AUTHORITY HAVING JURISDICTION SUCH AS MUNICIPAL BUILDING DEPARTMENT FIRE DEPARTMENT FIRE PREVENTION BUREAU etc CONSULT BEFORE INSTALLATION TO DETERMINE THE NEED TO OBTAIN A P...

Page 2: ......

Page 3: ...e Shields 9 C Vertical Exit Using DVL Close Clearance Pipe Listed 2100 UL 103 HT chimney with Close Clearance Pipe Shields 11 D Vertical Wall Exit Using DVL Close Clearance Pipe and Elbow Listed 2100...

Page 4: ...8 Install in accordance with 24 CFR Part 3280 HUD NOTE When burning any unit or appliance that combusts fuel for heat such as coal oil wood or natural and L P liquid petroleum gas We highly recommend...

Page 5: ...gs gift wrapping treated or painted wood or any type of coal DO NOT USE CHEMICALS OR FLUIDS TO START FIRE DO NOT BURN GARBAGE OR FLAMMABLE FLUIDS The primary air which is controlled by the user burns...

Page 6: ...to test motor and fan Do not run cord under unit or in high traffic areas 3 Check primary air draft control to ensure that it slides freely 4 Remove any items from within firebox AIR CONTROL Chimney...

Page 7: ...the overall R value of the system is grater than the R value of the specified floor protec tor the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K...

Page 8: ...flue collar These methods should be employed when connecting the room heater to a masonry chimney factory built chimney or masonry fireplace when the connection from the room heater to a masonry chimn...

Page 9: ...downward and secure each section to each other using at least three 3 sheet metal screws or rivets Single wall pipe is to be connected with 3 sheet metal screws or rivets to connector collar on heater...

Page 10: ...mum floor protector The clearances above may be reduced Follow NFPA 211 codes if available or follow instructions on Pages 11 and 12 C C D C C Figure 5 SINGLE WALL CONNECTOR PIPE CEILING SUPPORT CEILI...

Page 11: ...ow in position and project a point onto plumb line level with center of elbow 3 Measure up so there will be at least 1 4 rise per foot of horizontal connector pipe maintaining clearances to the ceilin...

Page 12: ...rotector Clearances above may be reduced Follow NFPA 211 codes if available or follow instructions on Pages 13 and 14 Figure 6 A B C D E F G MODEL 21 ELITE 25 13 13 15 5 8 6 16 BACK WALL S IDE W A LL...

Page 13: ...plumb bob Mark ceiling where string is suspended to locate center of the chimney 2 After locating center of hole install ceiling support box chimney or chimney connector flashing and rain cap per chim...

Page 14: ...LATION FLASHING CONTEMPORARY CAP STORM COLLAR DO NOT OBSTRUCT CAULK SIDE WALL LISTED 2100 UL 103 HT TYP CHIMNEY RADIATION SHIELD LISTED 2100 UL 103 HT TYP CHIMNEY DVL CLOSE CLEARANCE PIPE Pipe Shield...

Page 15: ...s between pipe and ceiling 2 Place vertical portion of heater pipe and elbow in position and project a point onto plumb line level with center of elbow 3 Measure up so there will be at least 1 4 rise...

Page 16: ...r protector Figure 10 BACK WALL S IDE W A LL A E B F C C D G C C BACK WALL S IDE W A LL A E B F C C D G A E B D F BACK WALL SIDE WALL PROTECTOR PAD G H A B C D E F G MODEL 21 ELITE 19 7 7 8 5 8 6 16 D...

Page 17: ...1 4 circle on floor protector Cut out floor protector and continue all the way threw floor See Figure 12 7 Obtain outside air duct and slip duct down through the 4 1 4 hole until the face of outside a...

Page 18: ...unit Your unit is equipped with automatic thermostat when stove gets hot enough this will activate your blower system You may adjust your fan speed by using the rheostat located on back left side faci...

Page 19: ...cates a defective or poorly positioned chimney Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near the open damper with a poker or fire tong Once chimney hea...

Page 20: ...orrect position meeting the correct minimum clearance 5 Your unit is equipped with 4 leveling legs located on outer bottom at each corner you may have to adjust for your unit to sit level See Page 16...

Page 21: ...the overall R value of the system is grater than the R value of the specified floor protec tor the alternate is acceptable Example The specified floor protector should be 3 4 thick material with a K...

Page 22: ...s suspended to locate center of chimney 2 After locating center of hole install ceiling support box chimney or chimney connector flashing and rain cap per chimney manufacturer s instructions and local...

Page 23: ...DVL Close Clearance pipe and minimum floor protector A B C D E F G H MODEL 21 19 7 84 8 5 8 6 16 48 C Figure 21 CEILING SUPPORT CEILING INSTALLATION FLASHING CONTEMPORARY CAP STORM COLLAR DO NOT OBST...

Page 24: ...usually indicates a defective or poorly positioned chimney Some chimneys with a marginal draft can be preheated by lighting newspaper and holding it near open damper with a poker or fire tong Once ch...

Page 25: ...the back of stove and place the pipe shield 1 above stove top on both sides keeping the pipe shield centered at the back See Figure 23 3 Using the screws provided fasten pipe shield to the top back o...

Page 26: ...ieces of dry kindling on top of newspaper 6 Place three or four small pieces of firewood 2 3 in diameter on top of kindling 7 Light newspaper in front Close and latch door Don t leave fire unattended...

Page 27: ...Figure 25 Operation After heartier has warmed up the thermostat will automatically turn on blower When the stove cools off thermostat will automatically shout off blower Figure 25 WHITE BLACK BLACK JU...

Page 28: ...ming 5 Obtain silicone glue and run a 3 16 bead inside door frame 6 Obtain gasket s and place in gasket channel areas starting at lower right corner See below Use a technique which assures that gasket...

Page 29: ...Baffle Board and 1st Secondary Air Tube reverse steps 1 2 NOTE A chimney cap should be installed to prevent moisture from entering chimney to prevent sparks and burning materials from escaping chimney...

Page 30: ...es A build up on glass that has been there for a considerable length of time can be burned off with a propane torch or straight razor blade Use protective gloves when using razor To replace broken or...

Page 31: ...cord in receptacle outlet To replace Motor from rear of unit 1 NOTE Make sure stove is cool and unplug power cord to unit 2 To access motor remove rear back by unscrewing the twelve 12 screws holding...

Page 32: ...open cabinet doors Motor cover is located in left upper rear See Figure 31 3 Remove two 2 screws holding motor cover and lay aside See Figure 31 4 NOTE Mark wires before unwiring motor 5 Replace moto...

Page 33: ...HANDLE 2 KNOB S FOR SCREEN DOORS 1 KNOB FOR AIR CONTROL 3 SECONDARY AIR TUBE S 1 BAFFLE BOARD 3 COTTER PINS FOR SECONDARY AIR TUBE S FULL FIRE BRICK 1 1 4 T X 4 1 2 W X 9 L CUT FIRE BRICK 1 1 4 T X 2...

Page 34: ...ers CAUTION Never remove ashes from heater with blower running DISPOSAL OF ASHES Ashes should be placed in a metal container with a tight fitting lid The closed container of ashes should be placed on...

Page 35: ...draft or inlet air a Close inlet air control as much as possible to maintain desired heat output b Check gaskets reinstall fiberglass gasket around doors and glass as necessary Improper door fitting...

Page 36: ...any labor or transportation charges required Thereafter B Period II For a period after first year from date of purchase and extending for five 5 years as long as the Buck Stove is owned by original p...

Page 37: ...of which is not covered by warranty OTHER RIGHTS This warranty gives you specific legal rights and you may also have other rights which vary from state to state OWNER REGISTRATION CARD The attached Ow...