![Buckingham RFPBASIC Instructions Manual Download Page 3](http://html1.mh-extra.com/html/buckingham/rfpbasic/rfpbasic_instructions-manual_2826003003.webp)
RFP Inst -Warn (Rev. 02/11/19)
Page 3 of 14
P/N 230418
A.
Installing the P/N 39Y11Q2-150 Lifeline (Basic Application
–
see Fig. 1 for components):
1.
Determine ladder placement to reach the work area.
2.
Ensure the area behind the structure is clear of objects, persons, animals or anything that the throw bag could contact /
damage / injure.
3.
Ensure the path of the throw bag and line are clear of any powerlines, phone line or other utility cables and wires.
4.
Follow the BuckLaunch product instructions and launch the throw bag with throw line attached over the structure and
towards the anchor or the work area (Fig. 3). When launching the throw bag ensure the path and area where the throw bag
will land is clear as noted in steps 2 and 3 above.
5.
Attach the end of the throw line to the anchor eye of the lifeline and pull over the structure towards the anchor
(Fig. 4 - 5). Note: If the BuckArrester is installed on the lifeline you must maintain the position of the BuckArrester so that
when you pull the lifeline over the structure it will remain where you can access it. If the BuckArrester is not installed on the
lifeline, follow Section E below.
B.
Installing P/N 3904J12-8 Lifeline Temporary Anchor Strap:
1.
Choose a suitable fall arrest anchor point (see 4 under Review of Jobsite above). Anchor needs to be located such that when
the lifeline is installed the position of the anchor will keep the lifeline in the work area, away from any edges and prevent a
swing.
2.
Wrap temporary anchor strap around suitable anchor (Fig. 6).
3.
Insert the small D-ring through the larger D-ring (Fig. 7).
4.
Pull end of strap with smaller D-ring through larger D-ring choking the strap around the anchor (Fig. 8).
Note: On a smaller diameter anchor, it may be necessary to wrap the strap around the anchor multiple times before
choking the strap (Fig. 9).
C.
Attaching Lifeline to Temporary Anchor Strap:
1.
Untie throw line from eye of lifeline (Fig. 10).
2.
Attach P/N 5005 Carabiner to eye of lifeline (Fig. 11).
3.
Connect the carabiner to the small D-ring on the temporary anchor strap (Fig. 12).
Fig. 3
Fig. 4
Fig. 5
Suitable
Anchor
Fig. 6
Fig. 7
Fig. 8
Fig. 9
Suitable
Anchor
Suitable
Anchor
Lifeline
Fig. 10
Fig. 11
Fig. 12
Lifeline
Throw
Line
Throw
Line
Work
Area
Large
D-Ring
Small D-Ring