
Büchi Labortechnik AG
Operating top-mount drying racks | 8
Operation Manual Lyovapor™ L-300/L-300 Pro
87/118
u
Fit manifold valve onto the connection on the
top-mount drying rack.
u
Check the O-ring for damage.
u
Place the O-ring into the groove of the cover.
u
Place the manifold cover on the cylinder.
u
Carry out freeze-drying.
8.3
Operating manifold acrylic drying chamber (non-heatable shelf)
u
Make sure that the groove above the ice
condenser is clean, free of dust and not
scratched.
u
Check the O-ring for damage.
u
Place the O-ring into the groove on the ice
condenser.
Summary of Contents for Lyovapor L-300
Page 1: ...Lyovapor L 300 L 300 Pro Operation Manual 1153869 D en...
Page 117: ......