This document is a
Property of BTCPower Inc.
and shall not be
copied, reproduced, or used as the basis for sale or manufacture
of apparatus without written permission.
10-Dec-20
Revision
D
150kW High Power DC Charger
INSTALLATION AND USER’S MANUAL
Page
31
of
63
INSTALLATION
TOWER AC Input
–
Input Terminal Lug
Terminal Lug P/N
Opening per Pole
Wire Range
Torque Requirement
600L2
1
600kcmil
–
2AWG
(copper or aluminum)
550 in-lb
NOTE
The system is not phase rotation sensitive, thus there is no concern over the phasing of
the termination of the AC Lines.