1) - The g joons are screwed  nto the anchor.
    - The prepared anchorage  s embedded  n the concrete.

G jon

Anchor

M n 30mm

Incom ng 
energy
hose

Outgo ng 
energy
hose

H

A

A

Pole He ght

A

H

3mt - 4mt           35cm     50cm

4mt - 5mt           40cm     50cm

6mt - 7mt           50cm     80cm

8mt - 9mt           60cm     90cm

10mt - 12mt       70cm     120cm

Concrete D mens ons

Concrete

G jons should be m n
30mm above the anchorage

2) After the concrete has been dr ed, the electr cal cables are pulled and the nuts are removed.

Concrete

Concrete

Incom ng 
energy
cable

Outgo ng 
energy
cable

Summary of Contents for ARTE

Page 1: ... Des gned to last n extremely harsh env ronments RECOMMENDATIONS FOR THE USER 1 Before the nstallat on make sure that there s no voltage 2 Do not touch the fitt ng when t s work ng on sw tched on 3 Do not look at the fitt ng d rectly or from a short d stance 4 D sconnect sw tch off the fitt ng before chang ng the lamps NOTES Techn cal amendments are reserved CE Conform ty mark The manufacturer s then ...

Page 2: ...s embedded n the concrete G jon Anchor M n 30mm Incom ng energy hose Outgo ng energy hose H A A Pole He ght A H 3mt 4mt 35cm 50cm 4mt 5mt 40cm 50cm 6mt 7mt 50cm 80cm 8mt 9mt 60cm 90cm 10mt 12mt 70cm 120cm Concrete D mens ons Concrete G jons should be m n 30mm above the anchorage 2 After the concrete has been dr ed the electr cal cables are pulled and the nuts are removed Concrete Concrete Incom ng...

Page 3: ...42 50 Fax 90 312 502 74 75 Email info bsilighting com ARTE INSTALLATION GUIDE 3 Lum na res energy cable s pulled by connect ng to the w re ns de the arm The lum na re s placed n ts place and the sleeve s t ghtened Fuse Cover Sleeve Energy Cable 4 Fuse cover s removed from the pole Fuse Cover ...

Page 4: ...50 Fax 90 312 502 74 75 Email info bsilighting com ARTE INSTALLATION GUIDE 5 Pass the power cable through the ns de of the pole and remove t from the fuse cover T ghten the lum na re to the pole w th setscrews The pole s fixed on the anchor and the washer nuts are t ghtened Setscrew Energy Cable ...

Page 5: ...bsilighting com ARTE INSTALLATION GUIDE 6 Fuse box is removed Electrical connection is done The fusebox and the fuse cover is re mounted Lum nare Cable Output Energy Input Energy L Brown Green Yellow N Blue Fuse Box Connect on Please contact us for cables f n d fferent colors Lum nare Cable 1 2 unscrew Fuse box removal from pole 3 ...

Reviews: