17
L
S
P
E
B
Step 2
After the screed (E) has hardened, remove the
placeholder (PH) from the screed and lay the floor
covering (B). Then spread silicone (S) around the
cutout on the flooring (B). Insert the cables /conduits
(L) into the housing and put the floor socket into
the cutout and place it on the frame .