MODELS:
Logical character search strings using AND/OR/NOT operators with "asterisk" and "question mark" wildcards, or list ALL models explicitly.
Priority 1:
Immediate and unconditional; current production halted until new parts or procedures available. All finished units retrofitted.
Priority 2:
All units in production (i.e. all unfinished units) will use new parts or procedures as soon as they become available.
Priority 3:
New parts or procedures will be used as soon as they become available AND as soon as existing parts are depleted or declared dead stock.
Priority 4:
Alternate parts MAY be used as demand requires.
SAFETY STANDARDS EVALUATIONS:
All changes must be assessed to determine their possible impact on Safety Standards approvals and the need to either resubmit
specific documentation, or the entire unit, for updated certification. If it is determined that Safety Standards approvals may be affected, then
a Safety Standards Approval
Report
must be attached to this ECO detailing steps taken to update necessary approvals.
ECO12.dot WRP 25 JULY 2003
ENGINEERING CHANGE ORDER #735
MODELS
AFFECTED:
PP300*
SUBJECT:
COMPONENT CHANGES on AFSS-R12 (AC filter & Soft-Start
board)
Revised shield IN-AFSS10-R12
DETAILED DESCRIPTION of, and REASONS for, CHANGE
Diode
DZ404
, currently a
1N4733
(5V1/1W), can be replaced with
1N5231
(5V1/500mW) on the AFSS-R12 board if its leads are too large for the present holes.
Future revisions of this board will feature larger holes to accommodate the 1N4733’s
heavier leads
.
The
IN-AFSS-10
insulator shield, installed behind AFSS-r12 board, is replaced with the
IN-AFSS-12
and is now made from
Formex GK17
polypropylene to meet safety
standards requirements.
Updated model BOM is PP300-M2
ISSUE DATE
ENGINEER(s)
PRIORITY STARTING SERIAL No.
2004-02-17 F.N.
2
P300-000065
(SEE NOTE BELOW)
DOCUMENTS :
DOCUMENT NAME
DOCUMENT DESCRIPTION
ENGR(s)
STATUS
ASSEMBLY INSTRUCTION FOR AC FILTER &
SOFT START BOARD
F.N. COMPLETE
DRAWING FOR INSULATOR BEHIND OF THE AC
FILTER & SOFT START BOARD
F.N. COMPLETE
ENGINEERING
PURCHASING
PRODUCTION
APPROVAL
MANAGER’S
COMMENTS
ECO IMPACT REPORT
PURCHASING PRODUCTION
Have ALL affected BOMs been updated?
Comments:
Describe any issues relating to the implementation of this ECO:
IS A
SAFETY STANDARDS
RE-
EVALUATION REQUIRED (Y/N)?
Y
Summary of Contents for PowerPac 120