1. Maintain 115-v wiring and ground. Improper polarity will result in

rapid flashing LED and no furnace operation.

2. Make thermostat wire connections at the 24-v terminal block on the

furnace control. Failure to make proper connections will result in

improper operation (see 

Fig. 24

). 

3. Gas  supply  pressure  to  the  furnace  must  be  greater  than  4.5-In.

W.C. (0.16 psig) but not exceed 14-In. W.C. (0.5 psig).

4. Check all manual-reset switches for continuity.
5. Install blower compartment door. Door must be in place to operate

furnace.

6. Replace outer door. 

Start-Up Procedures

1. Purge gas lines after all connections have been made.
2. Check gas lines for leaks.

3. To Begin Component Self-Test: 

Remove blower access door. Disconnect the thermostat R lead from

the furnace control board. Manually close the blower door switch

closed.  Short  (jumper)  the  COM-24v  terminal  on  control  to  the

TEST/TWIN  3/16-inch  quick  connect  terminal  on  control  until

LED goes out (approximately 2 sec). Gas valve and humidifier will

not be turned on (see 

Fig. 28

).

NOTE: 

The  furnace  control  allows  all  components,  except  the  gas

valve, to be run for short period of time. This feature helps diagnose a

system problem in case of a component failure. Component test feature

will not operate if any thermostat signal is present at the control. 

4. Component test sequence is as follows (see service label attached to

furnace or 

Fig. 44

):

a. LED will display previous status code 4 times. 

b. Inducer motor starts and continues to run until Step f of 

component test sequence.

c. Hot surface igniter is energized for 15 sec., then off.

d. Blower motor operates on HEAT speed for 10 sec.

e. Blower motor operates on COOL speed for 10 sec.

f. Inducer motor stops.

g. Reconnect R lead to furnace control board, release blower door 

switch and re-install blower door. 

5. Operate furnace per instruction on door.
6. Verify  furnace  shut  down  by  lowering  thermostat  setting  below

room temperature.

7. Verify  furnace  restarts  by  raising  thermostat  setting  above  room

temperature.

A14637

Fig. 44 – Service Label

CAUTION

!

CUT HAZARD

Failure to follow this caution may result in personal injury. 

Sheet metal parts may have sharp edges or burrs. Use care and wear

appropriate  protective  clothing,  safety  glasses  and  gloves  when

handling parts and servicing furnaces.

WARNING

!

FIRE AND EXPLOSION HAZARD

Failure to follow this warning could cause personal injury, death and/or

property damage. 

Never  test  for  gas  leaks  with  an  open  flame.  Use  a  commercially

available soap solution made specifically for the detection of leaks to

check all connections.

WARNING

!

ELECTRICAL SHOCK HAZARD

Failure to follow this warning could result in personal injury, or death. 

Blower  access  door  switch  opens  115-v  power  to  control.  No

component operation can occur unless switch is closed. Caution must

be taken when manually closing this switch for service purposes.

Summary of Contents for 800SA

Page 1: ...r Hour 21 EXTERIOR MASONRY CHIMNEY FAN NAT INSTALLATIONS WITH TYPE B DOUBLE WALL VENT CONNECTORS NFPA AGA 22 VENTING NOTES FOR Fig 31 Fig 43 25 START UP ADJUSTMENT AND SAFETY CHECK 25 GENERAL 25 Table...

Page 2: ...residential garage must be installed as specified in the warning box in the Location section 9 The furnace may be used for construction heat provided that the furnace installation and operation compli...

Page 3: ...tion in a Garage CODES AND STANDARDS Follow all national and local codes and standards in addition to these instructions The installation must comply with regulations of the serving gas supplier local...

Page 4: ...tic discharge can affect electronic components Follow the Electrostatic Discharge Precautions Procedure listed below during furnace installation and servicing to protect the furnace electronic control...

Page 5: ...a volume of at least 50 cubic feet per 1 000 Btuh input rating for all gas appliances installed in the space Spaces having less than 50 cubic feet per 1 000 Btuh require the OUTDOOR COMBUSTION AIR MET...

Page 6: ...ns from the current edition of National Fuel Gas Code ANSI Z223 1 NFPA 54 1 For other than fan assisted appliances such as a draft hood equipped water heater A04002 1 SQ IN PER 4000 BTUH DUCTS TO OUTD...

Page 7: ...and dilution of flue gases However in buildings with unusually tight construction additional air MUST be provided using the methods described in the Outdoor Combustion Air Method section 4 Unusually...

Page 8: ...Table 3 and Fig 9 3 Construct plenum to dimensions specified see Table 3 and Fig 9 4 If downflow subbase KGASB is used install as shown see Table 10 If Coil Assembly Part No CNPV CNRV CAP and CNR or...

Page 9: ...red 11 13 16 284 19 483 13 7 16 341 20 5 8 600 Downflow Applications on Combustible Flooring with Cased Coil subbase not required 12 5 16 319 19 483 13 5 16 338 20 508 17 1 2 445 Upflow Applications o...

Page 10: ...revent screws from pulling out use 2 8 x 3 4 in 19 mm screws into the side and 2 8 x 3 4 in 19 mm screws in the bottom of the furnace casing for each strap see Fig 14 and Fig 15 If the screws are atta...

Page 11: ...0 ft 3 M of main duct to the first branch take off may require internal acoustical lining As an alternative fibrous ductwork may be used if constructed and installed in accordance with the latest edit...

Page 12: ...915 915 825 785 740 700 48070E21 Gray Cooling Do not use for heating 1735 1685 1640 1595 1545 1495 1450 1405 1360 1310 Yellow Alt Cooling or alt Heating 1480 1435 1395 1340 1290 1240 1190 1135 1085 10...

Page 13: ...side inlets a combination of 1 side and the bottom or the bottom only will ensure adequate return air openings for airflow requirements above 1800 CFM Fig 17 Dimensional Drawing 60110E24 Gray Cooling...

Page 14: ...of Massachusetts 1 Gas supply connections MUST be performed by a licensed plumber or gas fitter 2 When flexible connectors are used the maximum length shall not exceed 36 inches 915 mm 3 When lever h...

Page 15: ...NPT plugged tapping accessible for test gauge connection MUST be installed immediately upstream of gas supply connection to furnace and downstream of manual equipment shutoff valve WARNING FIRE OR EXP...

Page 16: ...electrical circuit with a properly sized fuse or circuit breaker for this furnace See Table 7 for wire size and fuse specifications A readily accessible means of electrical disconnect must be located...

Page 17: ...WITCH WHT BLK WHT BLK NOTES Connect Y terminal in furnace as shown for proper blower operation Some thermostats require a C terminal connection as shown If any of the original wire as supplied must be...

Page 18: ...es into electrical box 9 Remove cover from furnace J Box 10 Route field ground wire through holes in electrical box and casing and into furnace J Box 11 Reattach furnace J Box to furnace casing with s...

Page 19: ...board thermostat strip The HUM terminal is energized when the pressure switch closes during a call for heat see Fig 28 NOTE DO NOT connect furnace control HUM terminal to HUM humidifier terminal on Th...

Page 20: ...or condensation in the venting system These furnaces are approved for common venting and multistory venting with other fan assisted or draft hood equipped appliances in accordance with the NFGC the lo...

Page 21: ...appliances connected to the venting system are not in operation 1 Seal any unused openings in venting system 2 Inspect the venting system for proper size and horizontal pitch as required in the curre...

Page 22: ...on in the furnace and or venting system Derating is permitted only for altitudes above 2000 ft 610 M 3 Adjust the air temperature rise to the midpoint of the rise range or slightly above Low air tempe...

Page 23: ...the furnace being vented Follow all manufacturer s installation requirements for venting and termination included with the listed mechanical venter Caution For the following applications use the mini...

Page 24: ...lication Vent Elbow Left A03208 Fig 36 Upflow Application Vent Elbow Up A03212 Fig 37 Downflow Application Vent Elbow Up then Right A03218 Fig 38 Horizontal Right Application Vent Elbow Right SEE NOTE...

Page 25: ...Data Sheet for accessory listing 6 Factory authorized accessory Downflow Vent Guard Kit required in downflow installations with lower vent configuration See Product Data Sheet for accessory listing 7...

Page 26: ...ure will not operate if any thermostat signal is present at the control 4 Component test sequence is as follows see service label attached to furnace or Fig 44 a LED will display previous status code...

Page 27: ...fices See EXAMPLE 1 3 Adjust manifold pressure to obtain correct input rate a Turn gas valve ON OFF switch to OFF b Remove manifold pressure tap plug from gas valve see Fig 21 c Connect a water column...

Page 28: ...When thermometer readings stabilize subtract return air temperature from supply air temperature to determine air temperature rise NOTE If the temperature rise is outside this range first check 1 Gas i...

Page 29: ...Ammeter WARNING FURNACE OVERHEATING HAZARD Failure to follow this caution may result in reduced furnace life Recheck temperature rise It must be within limits specified on the rating plate Recommende...

Page 30: ...urn thermostat below room temperature or from HEAT to OFF and turn 115v power OFF then back ON 3 Check Pressure Switch This control proves operation of the draft inducer blower a Turn off 115 v power...

Page 31: ...S switch until LED goes out then reconnect it NOTE If wire to LS or DSS is disconnected longer than 4 sec main blower starts and status code is overwritten with a limit circuit 33 code 2 When above it...

Page 32: ...wheel as follows 1 Turn off electrical supply to furnace 2 Remove outer door 3 For downflow or horizontal furnaces having vent pipes within the furnace that pass in front of the blower access door a...

Page 33: ...eavy build up of soot and carbon indicates that a problem exists which needs to be corrected such as improper adjustment of manifold pressure insufficient or poor quality combustion air incorrect size...

Page 34: ...TV sealant G E 162 P771 9003 is available through RCD in 3 oz tubes 12 Apply new sealant to flange of collector box and attach to cell panel using existing screws making sure all screws are secure 13...

Page 35: ...zing the humidifier terminal HUM The inducer motor IDM will remain energized for a 5 second post purge period The blower motor BLWM and air cleaner terminal EAC 1 will remain energized for 90 120 150...

Page 36: ...tart Up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations 36 WIRING DIAGRAM A19...

Page 37: ...f s u o i v e r p o n s a w r a t s l l i w r e c u d n i e h T e c n e u q e s t s e t t n e n o p m o c f e i r b a h g u o r h t o g l l i w n u r d n a t w o l b I S H e h T t s e t t n e n o p m...

Page 38: ...estricted duct system Loose blower wheel Defective switch or connections Defective blower motor or capacitor Inadequate combustion air supply flame rollout switch open Restricted vent Proper vent sizi...

Page 39: ...ealer listing by brand name or contact BRYANT HEATING COOLING SYSTEMS Consumer Relations Department P O Box 4952 Syracuse New York 13221 4952 1 800 428 4326 Have available the model number series numb...

Page 40: ...46231 Edition Date 03 20 Catalog No II800SA 04 Replaces II800SA 03 800SA 801SA Installation Start Up Operating and Service and Maintenance Instructions Manufacturer reserves the right to change at any...