
10
DETAIL “A”
PLACE ALL SEAL STRIP IN PLACE BEFORE PLACING
UNIT ON ROOF CURB.
DUCT END
SEE DETAIL “A”
914 - 1371
( 36” - 54” )
“B”
“A”
“C”
C10774
UNIT
MAX WEIGHT
DIMENSIONS
A
B
C
LB
KG
IN
MM
IN
MM
IN
MM
581J*14
2215
1009
116.0
2945
62.5
1590
59.5
1510
NOTES
:
1. SPREADER BARS REQUIRED — Top damage will occur if spreader bars are not used.
2. Dimensions in ( ) are in millimeters.
3. Hook rigging shackles through holes in base rail, as shown in detail “A.” Holes in base rails are centered around
the unit center of gravity. Use wooden top to prevent rigging straps from damaging unit.
Fig. 6 -- Rigging Details
Positioning on Curb —
For full perimeter curbs CRRFCURB074A00 and 075A00,
the clearance between the roof curb and the front and rear
base rails should be
1
/
4
in (6.4 mm). The clearance between
the curb and the end base rails should be
1
/
2
in (13 mm). For
retrofit applications with curbs CRRFCURB003A01 and
4A01, the unit should be position as shown in Fig. 7.
Maintain the 15.5 in (394 mm) and 8
5
/
8
in (220 mm)
clearances and allow the 22
5
/
16
in (567 mm) dimension to
float if necessary.
C10003
Fig. 7 -- Retrofit Installation Dimensions
If the alternative condensate drain location through the
bottom of the unit is used in conjunction with a retrofit
curb, the hole in the curb must be moved 12.5 in (320
mm) towards the end of the unit. (See Fig. 8.)
Although unit is weatherproof, guard against water from
higher level runoff and overhangs.
Remove all shipping materials and top skid. Remove extra
center post from the condenser end of the unit so that the
condenser end of the unit matches Figs. 27 and 28.
Recycle or dispose of all shipping materials.
Original
Position
New Position
(moved 12.5 in.)
C10904
Fig. 8 -- Alternative Condensate Drain Hole Positions
IMPORTANT
:
If the unit has the factory--installed Thru--the--Base
option, make sure to complete installation of the option
before placing the unit on the roof curb.
See the following sections:
S
Factory--Option Thru--Base Connections
(Gas Connection)
on page 11
S
Factory--Option Thru--Base Connections
(Electrical Connections)
on page 18
NOTE
: If gas and/or electrical connections are not
going to occur at this time, tape or otherwise cover the
fittings so that moisture does not get into the building or
conduit in the interim.
581J
*14
Summary of Contents for 581Jx14 series
Page 4: ...4 C11338 Fig 2 Unit Dimensional Drawing 14 Size Unit 581J 14 ...
Page 5: ...5 C11339 Fig 2 Unit Dimensional Drawing 14 Size Unit cont 581J 14 ...
Page 8: ...8 C10772 Fig 4 Roof Curb Details 581J 14 ...
Page 26: ...26 C150061 Fig 47 RTU Open System Control Wiring Diagram 581J 14 ...
Page 27: ...27 C150062 Fig 48 RTU Open System Control Wiring Diagram with Perfect Humidityt 581J 14 ...