
Form: 2435
Revision: 9
Free Flex Installation and Operation Manual
Date: 9-1-2017
Bryan Steam LLC, 783 N Chili Ave, Peru IN 46970
Web:
www.
bryanboilers
.com
Phone:
765-473-6651
Fax:
765-473-3074
Email:
74
Table 23: Gas Train and Upper Vestibule Controls
Key
No.
Description
(Quantity) Part
Number
3A
Blower
(1) 105326-01
3B
Swirl Plate
(1) 105327-01
3C
Manual Shut-Off Ball Valve
(1) 105325-01
3D
Main Gas Valve
(1) 105330-01
3E
High Gas Pressure Switch
(1) 105328-01
3F
Low Gas Pressure Switch
(1) 105329-01
3G
Ball Valve, 1-1/8" Tapping
(1) 105324-01
3H
Blower Adapter
(1) 105259-01
3I
1/4"NPT Plug
(2) 806603599
3J
1/4"NPTx1/4" Tube Compression
Fitting
(2) 822658
3K
Pressure Switch Tubing
(3FT) 92465560
3L
Minimum Air Pressure Switch
(Combustion Air)
(1) 106239-01
3M
Maximum Air Pressure Switch
(Blocked Vent)
(1) 105691-01
3N
Auto-Reset High Limit
(1) 80160626