Installation and Operation of the HTK-Series, TTK 600, XRK 900, and HPC 900 Chambers
52
DOC-M88-EXX268_V1_12.2016
ð
This bayonet interface allows fast and reproducible exchange with other sample
stages. After locking the chamber, it is detected as a high temperature chamber by
DIFFRAC.DA VINCI if your machine is equipped with this.
For detailed instructions on connecting the chamber to the controller, cooling water, com-
pressed air cooling, vacuum/gas, and/or liquid nitrogen cooling, we refer to the
Anton Paar
Manual
supplied with the chamber.
Figure 6.4: HTK 1200N mounted on a goniometer
The turbomolecular pump is connected by a flexible bellow to the front of the chamber.
The backing-pump is standing outside the enclosure and is connected by two 1 m flexible
bellows (DN10KF) to the turbomolecular pump.
Alternatively, just the backing-pump standing outside is connected by three 1 m flexible
bellows (DN25KF) to the chamber flange by a 90° elbow, if a vacuum of about 10
-2
mbar is
sufficient.
Summary of Contents for Anton Paar
Page 6: ...Contents 6 DOC M88 EXX268_V1_12 2016 ...
Page 12: ...List of Figures 12 DOC M88 EXX268_V1_12 2016 ...
Page 26: ...General Remarks 26 DOC M88 EXX268_V1_12 2016 ...
Page 34: ...Vacuum Equipment 34 DOC M88 EXX268_V1_12 2016 ...
Page 135: ...DOC M88 EXX268_V1_12 2016 135 ...
Page 136: ...Bruker Corporation info baxs bruker com www bruker com Order No DOC M88 EXX268 ...