![BRP Sea-Doo MOVE I 1250 Long Galvanized/Painted Black Operator'S Manual Download Page 24](http://html1.mh-extra.com/html/brp/sea-doo-move-i-1250-long-galvanized-painted-black/sea-doo-move-i-1250-long-galvanized-painted-black_operators-manual_2820533024.webp)
24
T
TY
YP
PIIC
CA
AL
L
2. Load the watercraft on the trailer
and make sure that the bunks rest
flat on a flat part of the hull as
shown. If the bunks do not rest on
a suitable part of the hull, refer to
BUNK
LATERAL
POSITION
(PAGE 24) BUNK LATERAL PO-
SITION
section.
T
TY
YP
PIIC
CA
AL
L
1. Bunk resting flat
3. Tighten
the bolts
to
specified
torque.
T
Tiig
gh
htte
en
niin
ng
g tto
orrq
qu
ue
e
Bunk retaining
bolts
7 Nm (62
lbf-in)
B
Bu
un
nkk L
La
atte
erra
all P
Po
ossiittiio
on
n
W
WA
AR
RN
NIIN
NG
G
A
Allw
wa
ayyss sse
ett b
bo
otth
h b
bu
un
nkkss tto
o tth
he
e
ssa
am
me
e lla
atte
erra
all sstta
an
ncce
e..
To adjust the position:
1. With the PWC off the trailer, loos-
en the nuts on top of the support.
N
NO
OT
TE
E::
The supports may have a block under-
neath. The procedure is the same.
T
TY
YP
PIIC
CA
AL
L
2. Slide the bunk to the desired
position.
T
TY
YP
PIIC
CA
AL
L
3. Tighten nuts to specified torque.
4. Adjust the angle if necessary, refer
to
Bunk Angle
.
T
Tiig
gh
htte
en
niin
ng
g tto
orrq
qu
ue
e
Bunk support
nuts
41 Nm (30
lbf-ft)
S
Sp
pa
arrkk™
™ M
MO
OV
VE
E IIII M
Mo
od
de
ellss
This trailer is specifically made to
transport the Spark PWC. No adjust-
ment is required.
N
NO
OT
TIIC
CE
E
D
Do
o n
no
ott u
usse
e tth
hiiss ttrra
aiille
err tto
o ttrra
an
nssp
po
orrtt
a
an
nyy o
otth
he
err m
mo
od
de
ell o
off P
PW
WC
C.. U
Usse
e tth
hiiss
ttrra
aiille
err o
on
nllyy tto
o ttrra
an
nssp
po
orrtt tth
he
e S
Sp
pa
arrkk
m
mo
od
de
ellss..
TRAILER SET-UP
Summary of Contents for Sea-Doo MOVE I 1250 Long Galvanized/Painted Black
Page 5: ...5 G GE EN NE ER RA AL L I IN NF FO OR RM MA AT TI IO ON N...
Page 7: ...7 S SA AF FE ET TY Y I IN NF FO OR RM MA AT TI IO ON N...
Page 18: ...18 This page is intentionally blank REPORTING SAFETY DEFECTS...
Page 19: ...19 O OP PE ER RA AT TI IN NG G I IN NS ST TR RU UC CT TI IO ON NS S...
Page 32: ...32 This page is intentionally blank LOADING THE WATERCRAFT...
Page 33: ...33 M MA AI IN NT TE EN NA AN NC CE E...
Page 40: ...40 This page is intentionally blank TRAILER CARE...
Page 41: ...41 T TE EC CH HN NI IC CA AL L I IN NF FO OR RM MA AT TI IO ON N...
Page 47: ...47 W WA AR RR RA AN NT TY Y...
Page 53: ...53 C CU US ST TO OM ME ER R I IN NF FO OR RM MA AT TI IO ON N...
Page 57: ...57 CHANGE OF ADDRESS OWNERSHIP...
Page 58: ...58 This page is intentionally blank CHANGE OF ADDRESS OWNERSHIP...
Page 59: ...59 CHANGE OF ADDRESS OWNERSHIP...
Page 60: ...60 This page is intentionally blank CHANGE OF ADDRESS OWNERSHIP...
Page 61: ...61 NOTE CHANGE OF ADDRESS OWNERSHIP...
Page 62: ...62 NOTE CHANGE OF ADDRESS OWNERSHIP...
Page 63: ...63 NOTE CHANGE OF ADDRESS OWNERSHIP...
Page 64: ...64 NOTE CHANGE OF ADDRESS OWNERSHIP...
Page 65: ...65 NOTE CHANGE OF ADDRESS OWNERSHIP...