MS10-11C Issue 4d
42
Commissioning Form
Check-list
Engineers
Signature:__________________________ Print Name:___________________________
Commissioning Date:___/___/______
Yes No
n/a
Thermostat to trigger solid fuel circulation pump installed
Temp Solid Fuel stat set to °C
°C
Adequate drains in system pipe work to allow servicing
Thermostat positioned on Low Loss Header
Temperature Low Loss Header thermostat set at °C
°C
Pressure relief valve installed within 1m of boiler
Audible alarm installed On SCWS?
Availability of open circuit rads/ ufh zones Y/ N
What % of boiler output
%
Are pipe runs free from potential air locks
Are all pipes adequately lagged to within 1m of boiler?
Is the expansion vessel at the correct pre charge
bar
Is the system at the designed pressure
S/ F Circulator pump fires when flue stat triggered
C/ H Pump fires when Low Loss Header stat triggers
Does SCWS activate when circ pump off
Does SCWS reseal quickly and quietly
Does the stove installation comply with HETAS regs.
Does the installation comply with Building regs.
Is any electrical work compliant with Part P
Is the SCWS discharge pipe installed in accordance with Part G
Is the PRV discharge pipe installed in accordance with Part G
Is the flue compliant with Part J
Is the data plate correct & installed
Is
the
flue
draught
within
the
manufacturers
tolerances
Flue
Draught
reading
mbar/ mm
Stove
Controls
Explained
to
End
User
Correct
Fuels
Explained
to
End
User
Manufacturers
Clearances
Adhered
To
Instruction
Booklet
Left
With
End
User
HETAS
Certificate
Left
With
End
User
Does the heat from the stove get to the rads/ ufh via the Low Loss
Header