background image

Installation and Operation Manual

X-PR-IPS122-eng

Part Number 541B150AAG

January, 2011

2-6

Section 2 Installation

IPS122 Series

2-12 Setpoint Adjustment

NOTICE

Note: Moving the red-pointer does not change the setpoint.
It is merely a visual reminder of where setpoint was previously set.

Before operating the device, ensure all fluid connections have been
properly tightened and where applicable, all electrical connections
have been properly terminated.

WARNING

!

(Typical factory setting is at mid-scale.)

1. Connect the IPS pressure switch to a variable pressure source.

2. Apply pressure equal to the desired setpoint.

3. Slowly turn the setpoint adjustment screw (with a 1/8” or smaller

flathead screwdriver only) until the LED indicator on top of the IPS
pressure switch is activated. DO NOT OVERTIGHTEN.
(Refer to Figure 2-1 for adjustment screw location)

  • CLOCKWISE to activate the electronic switch to increase pressure
     setpoint.
  • COUNTERCLOCKWISE to activate the electronic switch to decrease
     pressure setpoint.

4. Change the applied pressure until the gauge is within the normal zone of

operating pressure.

5. Slowly continue to change the pressure and verify that the LED indicator

is activated at the desired setpoint.

6. Repeat pressure cycle to verify setting and readjust if necessary.

7. Adjust the red pointer mounted on the lens cover with a small

screwdriver to indicate the setpoint setting.

DO NOT attempt to adjust the red pointer by rotating the cover.

CAUTION

!

8. On a compound gauge, the zero is indicated by a range on the dial

rather than a setpoint.

When adjusting the setpoint, DO NOT overtighten the setpoint
adjustment screw in either direction. This may cause permanant
damage to the device.

CAUTION

!

Summary of Contents for IPS122

Page 1: ...es Installation and Operation Manual X PR IPS122 eng Part Number 541B150AAG January 2011 Brooks IPS122 2 Inch Stainless Steel Indicating Pressure Switches IPS122 2 Inch Stainless Steel Indicating Pres...

Page 2: ...utions may result in fire electrical hazards or improper operation Ensure that all equipment doors are closed and protective covers are in place except when maintenance is being performed by qualified...

Page 3: ...rch and chemicals to medical devices analytical instrumentation semiconductor manufacturing and more The Brooks product you have just received is of the highest quality available offering superior per...

Page 4: ...Installation and Operation Manual X PR IPS122 eng Part Number 541B150AAG January 2011 IPS122 Series THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Page 5: ...2 1 General 2 1 2 2 Receipt of Equipment 2 1 2 3 Recommended Storage Practice 2 1 2 4 Return Shipment 2 2 2 5 Transit Precautions 2 2 2 6 Removal from Storage 2 2 2 7 Gas Connections 2 2 2 8 Installat...

Page 6: ...ii IPS122 Series Installation and Operation Manual X PR IPS122 eng Part Number 541B150AAG January 2011 Contents THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Page 7: ...2 inch unit has the ability to operate lights or relays up to a maximum of 12 watts Available in a variety of pressure ranges and process connections This device provides solid state switching for cle...

Page 8: ...A on 0 to 5 Vdc 3 mA off 11 mA on Switch Leads Switch Differential Trip Position Pressure Ranges Available Appproximate Shipping Weight 300 Series stainless steel electropolished One piece polycarbona...

Page 9: ...ure Switch Dimensional Drawings Figure 1 1 IPS122 Dimensions 2 28 57 9 mm 1 88 47 8 mm 2 20 55 9 mm 1 18 30 1 mm 2 28 57 9 mm 2 16 54 9 mm 1 89 48 0 mm Cable Diameter 0 23 FRONT VIEW SIDE VIEW 1 95 49...

Page 10: ...Installation and Operation Manual X PR IPS122 eng Part Number 541B150AAG January 2011 1 4 Section 1 Introduction IPS122 Series THIS PAGE WAS INTENTIONALLY LEFT BLANK...

Page 11: ...00 Fax 215 362 3745 E mail BrooksAm BrooksInstrument com www BrooksInstrument com Brooks Instrument Brooks Instrument Neonstraat 3 1 4 4 Kitasuna Koto Ku 6718 WX Ede Netherlands Tokyo 136 0073 Japan P...

Page 12: ...can be downloaded from the Brooks website www BrooksInstrument com or are available from any of the Brooks Instrument locations provided on p 2 1 2 5 Transit Precautions To safeguard against damage du...

Page 13: ...invert operation of the LED indicator and or logic signal configuration to ascending or descending operation disassembly is required to change internal jumper switches 2 9 Mounting Mount the IPS pres...

Page 14: ...Section 2 Installation IPS122 Series 2 11 Electrical Connections Refer to the appropriate wiring diagram for wiring connections to the IPS pressure switch Figure 2 2 BOTTOM Setpoint Adjust Screw Remov...

Page 15: ...tail Leads Red 8 30 VDC Black Logic Out Green Common User provided 3K pull up resistor Logic Out high level power supply VDC 8 30 VDC high level setpoint exceeded 0 1 VDC normal WARNING DO NOT connect...

Page 16: ...ssure switch is activated DO NOT OVERTIGHTEN Refer to Figure 2 1 for adjustment screw location CLOCKWISE to activate the electronic switch to increase pressure setpoint COUNTERCLOCKWISE to activate th...

Page 17: ...gas purge the device thoroughly with a dry inert gas such as Nitrogen before disconnecting gas connections Failure to correctly purge the device could result in fire explosion or death Corrosion or co...

Page 18: ...of Seller BROOKS SERVICE AND SUPPORT Brooks is committed to assuring all of our customers receive the ideal flow solution for their application along with outstanding service and support to back it u...

Reviews: